2010:Controls 01.26: Difference between revisions
From 1511Wookiee
Jump to navigationJump to search
(New page: = Attendance: = Crystal, Averill, Karen = Tasks: = *Take measurements of the new official box to create a model of the sheet metal mount so that it can be fabricated ASAP. *Switch the...) |
No edit summary |
||
(4 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
= Attendance: = | = Attendance: = | ||
Crystal, Averill, | Crystal, Averill, Fellows | ||
= Tasks: = | |||
*Take measurements of the new official box to create a model of the sheet metal mount so that it can be fabricated ASAP. | |||
*Switch the joystick screws to black screws | |||
= | = Progress: = | ||
* | *We're awesome. What can I say? | ||
* | *Sheet metal has been updated to the official dimensions!<br>[[Image:SheetMetalAssembly.jpg]] |
Latest revision as of 18:32, 26 January 2010
Attendance:
Crystal, Averill, Fellows
Tasks:
- Take measurements of the new official box to create a model of the sheet metal mount so that it can be fabricated ASAP.
- Switch the joystick screws to black screws