Integration Meeting - Tuesday, January 26  
Integration Meeting - Tuesday, January 26  


Drivetrain: - competition wheels are mounted and tested  
Drivetrain: - competition wheels are mounted and tested
 
carpet test tonight?


*carpet test tonight?
- axles are bent... (wrong brackets?)  
- axles are bent... (wrong brackets?)  
- programming issue that needs to be resolved  
- programming issue that needs to be resolved  
- encoders coming soon hopefully  
- encoders coming soon hopefully  
- still waiting on Harris for fabrication  
- still waiting on Harris for fabrication  


Mech 1:  
Mech 1:  
- not pneumatics  
 
- not pneumatics
 
- telescoping winch device  
- telescoping winch device  
- checking weights and motors  
 
--> planning on the CIM - 3x 19"tubes  
- checking weights and motors --> planning on the CIM - 3x 19"tubes  
 
- hook has been designed  
- hook has been designed  
- overall weights of the moving tubes and hook is about a pound and a half  
- overall weights of the moving tubes and hook is about a pound and a half  
- still determining location of the hanger  
- still determining location of the hanger  


Mech 2:  
Mech 2:  
- electrical clutch mounted (form a John Deer tractor... illegal?)  
- electrical clutch mounted (form a John Deer tractor... illegal?)  
- 50% into inventor  
 
- actuator needs to be picked  
- 50% into inventor - actuator needs to be picked  
- 2 window motors to be used  
 
- over center trip mech included  
- 2 window motors to be used - over center trip mech included  
 
- starting and prototyping the beater bar design tonight  
- starting and prototyping the beater bar design tonight  


Electrical:  
Electrical:  
- electrical board is mounted  
- electrical board is mounted  
- place in front for weight issues?  
- place in front for weight issues?  


Field:  
Field:  
- bumps are completed  
- bumps are completed  
- towers not made because the pipes are being cut to the right length  
- towers not made because the pipes are being cut to the right length  
- if anything besides the bump that is upstairs is needed, be sure to give advanced warning because they are outside in the pod for storage  
- if anything besides the bump that is upstairs is needed, be sure to give advanced warning because they are outside in the pod for storage  


Controls:  
 
- finalizing fabrication designs  
 
Controls:
 
- finalizing fabrication designs
 
- buttons in?  
- buttons in?  


Programming:  
Programming:  
- protobot fail  
- protobot fail  
- canbus error messages  
- canbus error messages  
- diagnosing the issue that made the robot not move smoothly  
- diagnosing the issue that made the robot not move smoothly  
- resolution cannot be upped on the camera  
- resolution cannot be upped on the camera  
- looking into another camera to switch to
 
- looking into another camera to switch to  
 
- working on autonomous tonight  
- working on autonomous tonight  
- mech 2 has camera dimensions  
- mech 2 has camera dimensions  
- must be 24" up near the mechanism  
- must be 24" up near the mechanism  
- has to be centered and protected
 
- used in teleoperated  
- has to be centered and protected  
--> tips up and down to help with blind spots.
 
- used in teleoperated --> tips up and down to help with blind spots.

Latest revision as of 13:45, 14 November 2010

Integration Meeting - Tuesday, January 26

Drivetrain: - competition wheels are mounted and tested

carpet test tonight?

- axles are bent... (wrong brackets?)

- programming issue that needs to be resolved

- encoders coming soon hopefully

- still waiting on Harris for fabrication


Mech 1:

- not pneumatics

- telescoping winch device

- checking weights and motors --> planning on the CIM - 3x 19"tubes

- hook has been designed

- overall weights of the moving tubes and hook is about a pound and a half

- still determining location of the hanger


Mech 2:

- electrical clutch mounted (form a John Deer tractor... illegal?)

- 50% into inventor - actuator needs to be picked

- 2 window motors to be used - over center trip mech included

- starting and prototyping the beater bar design tonight


Electrical:

- electrical board is mounted

- place in front for weight issues?


Field:

- bumps are completed

- towers not made because the pipes are being cut to the right length

- if anything besides the bump that is upstairs is needed, be sure to give advanced warning because they are outside in the pod for storage


Controls:

- finalizing fabrication designs

- buttons in?


Programming:

- protobot fail

- canbus error messages

- diagnosing the issue that made the robot not move smoothly

- resolution cannot be upped on the camera

- looking into another camera to switch to

- working on autonomous tonight

- mech 2 has camera dimensions

- must be 24" up near the mechanism

- has to be centered and protected

- used in teleoperated --> tips up and down to help with blind spots.