2010:FieldCrate 01:28: Difference between revisions
From 1511Wookiee
Jump to navigationJump to search
FieldCrate (talk | contribs) (New page: XX.XX.2010 Start time: End time: Members present: Members Attending Next Meeting: Tasks Completed: * task<br> * task <br>Tasks In Progress: * task<br> * task <br>Tasks to Comple...) |
FieldCrate (talk | contribs) No edit summary |
||
(One intermediate revision by the same user not shown) | |||
Line 1: | Line 1: | ||
1.28.2010 | |||
Start time: | Start time: 6:00 | ||
End time: | End time: 9:00 | ||
Members present: | Members present: Amy, Theo, Jason<br> | ||
Members Attending Next Meeting: | Members Attending Next Meeting: Theo, Amy, Jason<br> | ||
Tasks Completed: | Tasks Completed: | ||
* | *ordered netting for sides of field | ||
*ordered hardware for ball returns | |||
<br>Tasks In Progress: | <br>Tasks In Progress: | ||
* | *purchasing remaining materials for ball returns | ||
*cutting reamining ball return materials | |||
<br>Tasks to Complete: | <br>Tasks to Complete: | ||
* | *assemble ball returns | ||
*cut foam for goals | |||
<br>Materials Needed: | |||
<br> | *ball return pipes<br> | ||
Do not forget to add your needed items to the Shopping List!! | |||
Images & Additional Updates: | |||
(Make sure you are in the Rich Editor and use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. Sizing can be done using the length/width pixel size) | |||
(Make sure you are in the Rich Editor and use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. Sizing can be done using the length/width pixel size) | |||
Test Engineering Notebook Template | Test Engineering Notebook Template |
Latest revision as of 18:38, 28 January 2010
1.28.2010
Start time: 6:00
End time: 9:00
Members present: Amy, Theo, Jason
Members Attending Next Meeting: Theo, Amy, Jason
Tasks Completed:
- ordered netting for sides of field
- ordered hardware for ball returns
Tasks In Progress:
- purchasing remaining materials for ball returns
- cutting reamining ball return materials
Tasks to Complete:
- assemble ball returns
- cut foam for goals
Materials Needed:
- ball return pipes
Do not forget to add your needed items to the Shopping List!!
Images & Additional Updates:
(Make sure you are in the Rich Editor and use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. Sizing can be done using the length/width pixel size)
Test Engineering Notebook Template