2009:Mechanical 2 - 1.8.09: Difference between revisions
From 1511Wookiee
Jump to navigationJump to search
Mechanical2 (talk | contribs) (New page: Tasks completed: <br>- Worked with Drive Train to conclude to determine the spacing for collection. <br>- the spacing analysis is completed to the extent of what he have plane...) |
m (Mechanical 2 - 1.8.09 moved to 2009:Mechanical 2 - 1.8.09) |
||
(One intermediate revision by one other user not shown) | |||
Line 1: | Line 1: | ||
'''1.08.2009''' | |||
'''Start Time:''' | |||
'''End Time:''' | |||
<br>-Finish available space analysis after determining the sizes of the additional, drop door, paddle wheel, and mechanism that stops the balls from being sucked up while scoring. This should be done by Saturday morning. | '''Members Present:''' | ||
'''Tasks completed: '''<br>- Worked with Drive Train to conclude to determine the spacing for collection.<br>- the spacing analysis is completed to the extent of what he have planed in the design as of now. | |||
<br>'''Tasks to complete: '''<br>-Finish available space analysis after determining the sizes of the additional, drop door, paddle wheel, and mechanism that stops the balls from being sucked up while scoring. This should be done by Saturday morning. | |||
---- | |||
[[Mechanical 2|Mechanical 2 Main Page]] |
Latest revision as of 13:38, 14 November 2010
1.08.2009
Start Time:
End Time:
Members Present:
Tasks completed:
- Worked with Drive Train to conclude to determine the spacing for collection.
- the spacing analysis is completed to the extent of what he have planed in the design as of now.
Tasks to complete:
-Finish available space analysis after determining the sizes of the additional, drop door, paddle wheel, and mechanism that stops the balls from being sucked up while scoring. This should be done by Saturday morning.