2010:Drivetrain 02.06: Difference between revisions
From 1511Wookiee
Jump to navigationJump to search
Drivetrain (talk | contribs) (New page: XX.XX.2010 Start time: End time: Members present: Members Attending Next Meeting: Tasks Completed: * task<br> * task <br>Tasks In Progress: * task<br> * task <br>Tasks to Comple...) |
Drivetrain (talk | contribs) No edit summary |
||
(One intermediate revision by the same user not shown) | |||
Line 1: | Line 1: | ||
02.06.2010 | |||
Start time: | Start time:10:00 | ||
End time: | End time:9:00 | ||
Members present: | Members present: Matt M. Lizzy Ben S. Trestin | ||
Members Attending Next Meeting: | Members Attending Next Meeting: | ||
Tasks Completed: | Tasks Completed: | ||
* | *Scavanged parts - We now have working sidebars (the part the wheel guard attaches to) | ||
*Painted wheel guards | |||
*Designed bumpers - Basic design, no dimensions, nothing in inventor yet | |||
<br>Tasks In Progress: | <br>Tasks In Progress: | ||
* | *N/A at the time of writing | ||
<br>Tasks to Complete: | <br>Tasks to Complete: | ||
* | *Finish spraypainting | ||
<br>Materials Needed: | <br>Materials Needed: | ||
* item<br> * item | *item<br> * item | ||
Do not forget to add your needed items to the Shopping List!! | Do not forget to add your needed items to the Shopping List!! | ||
Images & Additional Updates: | Images & Additional Updates: | ||
(Make sure you are in the Rich Editor and use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. Sizing can be done using the length/width pixel size) | (Make sure you are in the Rich Editor and use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. Sizing can be done using the length/width pixel size) | ||
Test Engineering Notebook Template<br> | Test Engineering Notebook Template<br> |
Latest revision as of 15:52, 6 February 2010
02.06.2010
Start time:10:00
End time:9:00
Members present: Matt M. Lizzy Ben S. Trestin
Members Attending Next Meeting:
Tasks Completed:
- Scavanged parts - We now have working sidebars (the part the wheel guard attaches to)
- Painted wheel guards
- Designed bumpers - Basic design, no dimensions, nothing in inventor yet
Tasks In Progress:
- N/A at the time of writing
Tasks to Complete:
- Finish spraypainting
Materials Needed:
- item
* item
Do not forget to add your needed items to the Shopping List!!
Images & Additional Updates:
(Make sure you are in the Rich Editor and use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. Sizing can be done using the length/width pixel size)
Test Engineering Notebook Template