2010:Electrical Main 02.02: Difference between revisions
From 1511Wookiee
Jump to navigationJump to search
No edit summary |
No edit summary |
||
(2 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
'''Start time: '''6PM<br> | '''Start time: '''6PM<br> | ||
'''End time: ''' | '''End time: '''9:30PM<br> | ||
'''Members present: '''Dave squared, | '''Members present: '''Dave squared, Kevin, Vaughn, Mike H, Matthieu<br> | ||
'''Members Attending Next Meeting: '''<br> | '''Members Attending Next Meeting: '''<br> | ||
Line 13: | Line 13: | ||
'''Tasks Completed:'''<br> | '''Tasks Completed:'''<br> | ||
* | *Talked to Amy about getting lexan from Harris and looked at McMaster-Carr prices for backup.<br> | ||
<br> | <br> | ||
Line 21: | Line 21: | ||
'''Tasks In Progress:'''<br> | '''Tasks In Progress:'''<br> | ||
* | *Ordering Lexan | ||
<br> | <br> | ||
Line 31: | Line 27: | ||
---- | ---- | ||
'''Tasks to Complete: ''' | '''Tasks to Complete: ''' | ||
*Electrical Board Design(1 or two pieces)<br> | |||
*Build Electrical Board | |||
*Build covers for electrical board, and cRIO/radio area | |||
<br> | |||
---- | ---- | ||
Line 44: | Line 39: | ||
'''Materials Needed: ''' <br> | '''Materials Needed: ''' <br> | ||
* | *LEXAN!!! | ||
<br> | |||
Do not forget to add your needed items to the [[ShoppingList|Shopping List]]!! | Do not forget to add your needed items to the [[ShoppingList|Shopping List]]!! | ||
Line 54: | Line 49: | ||
'''Images & Additional Updates:''' | '''Images & Additional Updates:''' | ||
(Make sure you are in the Rich Editor and use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. Sizing can be done using the length/width pixel size) | (Make sure you are in the Rich Editor and use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. Sizing can be done using the length/width pixel size) | ||
'''''<u>THIS PAGE GOT OVER-WRITTEN! IT IS ACTUALLY THE SAME PAGE AS 2.09.10! IGNORE THIS PAGE!</u>''''' |
Latest revision as of 18:31, 9 February 2010
02.02.2010
Start time: 6PM
End time: 9:30PM
Members present: Dave squared, Kevin, Vaughn, Mike H, Matthieu
Members Attending Next Meeting:
Tasks Completed:
- Talked to Amy about getting lexan from Harris and looked at McMaster-Carr prices for backup.
Tasks In Progress:
- Ordering Lexan
Tasks to Complete:
- Electrical Board Design(1 or two pieces)
- Build Electrical Board
- Build covers for electrical board, and cRIO/radio area
Materials Needed:
- LEXAN!!!
Do not forget to add your needed items to the Shopping List!!
Images & Additional Updates:
(Make sure you are in the Rich Editor and use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. Sizing can be done using the length/width pixel size)
THIS PAGE GOT OVER-WRITTEN! IT IS ACTUALLY THE SAME PAGE AS 2.09.10! IGNORE THIS PAGE!