02.07.2010 | 02.07.2010 | ||
'''Start time: ''' | '''Start time: '''10am | ||
'''End time: ''' | '''End time: '''6pm | ||
'''Members present: '''Mike Hartman, Crystal, Karen F., Dave S. - NOTE Combined Controls & Main meeting<br> | '''Members present: '''Mike Hartman, Crystal, Karen F., Dave S. - NOTE Combined Controls & Main meeting<br> | ||
Line 14: | Line 14: | ||
*Mike worked on wiring the Electrical control board. | *Mike worked on wiring the Electrical control board. | ||
*estimated lengths of hardware (machine bolts) we will need to attach electrical components to new board - found some of them in the stock we have. | *estimated lengths of hardware (machine bolts) we will need to attach electrical components to new board - found some of them in the stock we have. | ||
*put PWM cable on one of the 10-turn pots we are using for the lifting winch sensor. | *put PWM cable on one of the 10-turn pots we are using for the lifting winch sensor. | ||
*found our stash of servos | *found our stash of servos | ||
Line 33: | Line 33: | ||
'''Tasks to Complete: '''<br> | '''Tasks to Complete: '''<br> | ||
*build electrical board | *build electrical board | ||
* | *The BOM must be transferred to the new official format on the integration page. | ||
<br> | <br> | ||
Line 42: | Line 42: | ||
'''Materials Needed: '''<br> | '''Materials Needed: '''<br> | ||
* | *'''''lexan''''' for the electrical board! | ||
*item | *item | ||
Latest revision as of 20:33, 7 February 2010
02.07.2010
Start time: 10am
End time: 6pm
Members present: Mike Hartman, Crystal, Karen F., Dave S. - NOTE Combined Controls & Main meeting
Members Attending Next Meeting:
Tasks Completed:
- Mike worked on wiring the Electrical control board.
- estimated lengths of hardware (machine bolts) we will need to attach electrical components to new board - found some of them in the stock we have.
- put PWM cable on one of the 10-turn pots we are using for the lifting winch sensor.
- found our stash of servos
Tasks In Progress:
- task
- task
Tasks to Complete:
- build electrical board
- The BOM must be transferred to the new official format on the integration page.
Materials Needed:
- lexan for the electrical board!
- item
Do not forget to add your needed items to the Shopping List!!
Images & Additional Updates:
(Make sure you are in the Rich Editor and use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. Sizing can be done using the length/width pixel size)