2010:Atlanta Prep: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
mNo edit summary
No edit summary
 
(7 intermediate revisions by 3 users not shown)
Line 7: Line 7:
'''General List'''  
'''General List'''  


1. Unpack items from Boston - ??
1. Unpack items from Boston - Jeff


2. Repack items for Atlanta - ??
2. Repack items for Atlanta - Jeff


3. Video Tape the Chairmans Presentation - Shauna/Becca/Kyle  
3. Video Tape the Chairmans Presentation - Shauna/Becca/Kyle  
Line 17: Line 17:
5. Thunderbolts - Kim  
5. Thunderbolts - Kim  


6. Rookie Meet &amp; Greet Booklet - Cynette <br>
6. Rookie Meet &amp; Greet Booklet - Cynette <br>  


&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; 6a. Rookie Research - ??
&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; 6a. Rookie Research -&nbsp;??  


7. Rookie Meet &amp; Greet Planning - Cynette/Crystal/Lee  
7. Rookie Meet &amp; Greet Planning - Cynette/Crystal/Lee  
Line 29: Line 29:
10. Sponsor Email - Val Drake  
10. Sponsor Email - Val Drake  


11. Make More Buttons -&nbsp;??
11. Make More Buttons -&nbsp;Mrs. Wolf and all others welcome.


12. Collect Boston Smugmug Photos -&nbsp;??  
12. Collect Boston Smugmug Photos -&nbsp;??  
Line 41: Line 41:
16. Coordinate Signups for Championship Conferences -&nbsp;??  
16. Coordinate Signups for Championship Conferences -&nbsp;??  


<br> '''Robot List'''
17. Update Robot Sheet - Kim


1. Fix Potentiometer Issues -&nbsp;??
18. New Chairmans Packets - Leann


2. Program Underglow -&nbsp;??
19. Prep for Atlanta PR presentation - Lee Drake/Crystal


3. Autonomous Code for tower blocking -&nbsp;??
<br>'''Robot List'''


4. Manual Mode Lifter Code work -&nbsp;??
1. Fix Potentiometer Mount &amp; Test on Arrival - Mike W., Mike H.


5. Fix Welds on lifter -&nbsp;??
2. Program Underglow - Justin B.<br>


6. Make Second Lifter Structure - Amy Averill
3. Autonomous Code for tower blocking - Done and Checked In, Awaiting Testing<br>
 
3.5.&nbsp; Swap autonomous up/down buttons - Jeff D.
 
4. Manual Mode Lifter Code work - Calvin D.<br>
 
5. Fix Welds on lifter -&nbsp;Mike W.<br>
 
6. Make Second Lifter Structure - Amy Averill, Tom K.
 
7. Order spare Electrical parts (Omron sensors, Multimeter, Current Meter) - Dave S., Mike H.
 
8. Order spare gas shock and any other "hard to replace" mech parts - Tom K.
 
9. Ensure we have spare drivetrain transmission - Tom C.

Latest revision as of 15:37, 30 March 2010

List of Tasks & Leaders for Atlanta Preparations 2010

This is a list created to help us track the preparations for Atlanta.  There is A LOT to be done, and we need everyone's help to do it.  PLEASE pitch in and sign up for things if you haven't already.


General List

1. Unpack items from Boston - Jeff

2. Repack items for Atlanta - Jeff

3. Video Tape the Chairmans Presentation - Shauna/Becca/Kyle

4. Practice the Chairmans Presentation - Shauna/Becca/Kyle

5. Thunderbolts - Kim

6. Rookie Meet & Greet Booklet - Cynette

         6a. Rookie Research - ??

7. Rookie Meet & Greet Planning - Cynette/Crystal/Lee

8. Press Releases - ??

9. Sponsor Newsletter - Matthieu/Val Drake

10. Sponsor Email - Val Drake

11. Make More Buttons - Mrs. Wolf and all others welcome.

12. Collect Boston Smugmug Photos - ??

13. Work on Scouting Laptops - Matthieu

14. PRINT Pit Scouting & Match Prep Sheets - Kyle

15. Make Master Schedule - Kim

16. Coordinate Signups for Championship Conferences - ??

17. Update Robot Sheet - Kim

18. New Chairmans Packets - Leann

19. Prep for Atlanta PR presentation - Lee Drake/Crystal


Robot List

1. Fix Potentiometer Mount & Test on Arrival - Mike W., Mike H.

2. Program Underglow - Justin B.

3. Autonomous Code for tower blocking - Done and Checked In, Awaiting Testing

3.5.  Swap autonomous up/down buttons - Jeff D.

4. Manual Mode Lifter Code work - Calvin D.

5. Fix Welds on lifter - Mike W.

6. Make Second Lifter Structure - Amy Averill, Tom K.

7. Order spare Electrical parts (Omron sensors, Multimeter, Current Meter) - Dave S., Mike H.

8. Order spare gas shock and any other "hard to replace" mech parts - Tom K.

9. Ensure we have spare drivetrain transmission - Tom C.