2011:Field 1/23/2011: Difference between revisions
FieldCrate (talk | contribs) (New page: Members present: <br>Members Attending Next Meeting: -------------------------------------------------------------------------------- Tasks Completed: Task 1 - Task 2 - ---...) |
FieldCrate (talk | contribs) No edit summary |
||
(One intermediate revision by one other user not shown) | |||
Line 1: | Line 1: | ||
Members present: | Members present: Jason, Manuel, Kieran, Shayna | ||
Mentors present: Amy, Lloyd | |||
<br>Members Attending Next Meeting: | <br>Members Attending Next Meeting: | ||
<br>-------------------------------------------------------------------------------- | |||
-------------------------------------------------------------------------------- | |||
Tasks Completed: | Tasks Completed: | ||
Task 1 - | Task 1 - Assembled 3 more tower assemblies. <br>Task 2 - Cut pieces for player stations table. <br>Task 3 - Paint player station walls. <br>Task 4 - Paint field elements. <br>Task 5 - Assembled player station walls. | ||
Task 2 - | |||
Task 6 - Cut lane dividers to proper length. | |||
-------------------------------------------------------------------------------- | -------------------------------------------------------------------------------- | ||
Line 21: | Line 17: | ||
Tasks In Progress: | Tasks In Progress: | ||
Task 1 - | Task 1 - Assemble player station tables. | ||
Task 2 - | Task 2 - Hardware selection. | ||
<br>-------------------------------------------------------------------------------- | <br>-------------------------------------------------------------------------------- | ||
Tasks to Complete: | Tasks to Complete: | ||
Task 1 - | Task 1 - Assemble 4 stop plates to poles. | ||
Task 2 - | Task 2- | ||
Task 3 - | |||
Task 4 - <br>-------------------------------------------------------------------------------- | |||
Materials Needed: | |||
<br>Item 1 - Field tape. | |||
Item 2 - Game pieces. | |||
- | Item 3 - Reflective Tape. | ||
Item 4 - Hardware for player station walls, velcro. | |||
---- | |||
Images & Additional Updates: | Images & Additional Updates: | ||
(Make sure you are in the Rich Editor and use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. Sizing can be done using the length/width pixel size) | (Make sure you are in the Rich Editor and use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. Sizing can be done using the length/width pixel size) |
Latest revision as of 10:11, 23 January 2011
Members present: Jason, Manuel, Kieran, Shayna
Mentors present: Amy, Lloyd
Members Attending Next Meeting:
--------------------------------------------------------------------------------
Tasks Completed:
Task 1 - Assembled 3 more tower assemblies.
Task 2 - Cut pieces for player stations table.
Task 3 - Paint player station walls.
Task 4 - Paint field elements.
Task 5 - Assembled player station walls.
Task 6 - Cut lane dividers to proper length.
Tasks In Progress:
Task 1 - Assemble player station tables.
Task 2 - Hardware selection.
--------------------------------------------------------------------------------
Tasks to Complete:
Task 1 - Assemble 4 stop plates to poles.
Task 2-
Task 3 -
Task 4 -
--------------------------------------------------------------------------------
Materials Needed:
Item 1 - Field tape.
Item 2 - Game pieces.
Item 3 - Reflective Tape.
Item 4 - Hardware for player station walls, velcro.
Images & Additional Updates:
(Make sure you are in the Rich Editor and use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. Sizing can be done using the length/width pixel size)