2011:Field 2/8/2011: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
(New page: Members present: <br>Members Attending Next Meeting: -------------------------------------------------------------------------------- Tasks Completed: Task 1 - Task 2 - ---...)
 
No edit summary
 
(2 intermediate revisions by 2 users not shown)
Line 1: Line 1:
Members present:  
Members present: Jason, Manuel, Shayna
 
Mentors present: Amy


<br>Members Attending Next Meeting:  
<br>Members Attending Next Meeting:  


<br>


<br>


 
----
 
--------------------------------------------------------------------------------


Tasks Completed:  
Tasks Completed:  


Task 1 -  
Task 1 - Built structure for 1 shelving unit


Task 2 -
Task 2 -  


<br>


 
----
--------------------------------------------------------------------------------  


Tasks In Progress:  
Tasks In Progress:  


Task 1 -  
Task 1 - Cut shelves for shelving unit


Task 2 -  
Task 2 -  
Line 29: Line 31:
Tasks to Complete:  
Tasks to Complete:  


Task 1 -  
Task 1 - Build second shelving unit
 
Task 2 - Place Refelective Tape on poles
 
Task 3 - Drill holes for rail alignment
 
Task 4 - Create plates for rail rigidity
 
Task 5 - Determine what to do for extra 2"&nbsp;pole length
 
Task 6 - Wrap post bottoms with solid material


Task 2 -  
Task 7 - Mount post toppers
 
Task 8 - Determine/Construct method to keep lane dividers in place
 
Task 9 - Mounting system on player stations for power/connectivity
 
Task 10 - Drill holes in each player station for cords


Task 11 - Drill 1 hole in each piece of Lexan for securing


Task 12 - Sand down inside of feeder plates


<br>


<br>


--------------------------------------------------------------------------------  
----


Materials Needed:  
Materials Needed:  


<br>Item 1 -  
<br>Item 1 - 4x4s


Item 2 -
Item 2 - Hardware for rails


--------------------------------------------------------------------------------  
----


Images &amp; Additional Updates:  
Images &amp; Additional Updates:  


(Make sure you are in the Rich Editor and use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. Sizing can be done using the length/width pixel size)
(Make sure you are in the Rich Editor and use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. Sizing can be done using the length/width pixel size)

Latest revision as of 04:53, 9 February 2011

Members present: Jason, Manuel, Shayna

Mentors present: Amy


Members Attending Next Meeting:




Tasks Completed:

Task 1 - Built structure for 1 shelving unit

Task 2 -



Tasks In Progress:

Task 1 - Cut shelves for shelving unit

Task 2 -


--------------------------------------------------------------------------------

Tasks to Complete:

Task 1 - Build second shelving unit

Task 2 - Place Refelective Tape on poles

Task 3 - Drill holes for rail alignment

Task 4 - Create plates for rail rigidity

Task 5 - Determine what to do for extra 2" pole length

Task 6 - Wrap post bottoms with solid material

Task 7 - Mount post toppers

Task 8 - Determine/Construct method to keep lane dividers in place

Task 9 - Mounting system on player stations for power/connectivity

Task 10 - Drill holes in each player station for cords

Task 11 - Drill 1 hole in each piece of Lexan for securing

Task 12 - Sand down inside of feeder plates




Materials Needed:


Item 1 - 4x4s

Item 2 - Hardware for rails


Images & Additional Updates:

(Make sure you are in the Rich Editor and use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. Sizing can be done using the length/width pixel size)