2011:Field 2/8/2011: Difference between revisions
FieldCrate (talk | contribs) (New page: Members present: <br>Members Attending Next Meeting: -------------------------------------------------------------------------------- Tasks Completed: Task 1 - Task 2 - ---...) |
Mechanical1 (talk | contribs) No edit summary |
||
(2 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
Members present: | Members present: Jason, Manuel, Shayna | ||
Mentors present: Amy | |||
<br>Members Attending Next Meeting: | <br>Members Attending Next Meeting: | ||
<br> | |||
<br> | |||
---- | |||
Tasks Completed: | Tasks Completed: | ||
Task 1 - | Task 1 - Built structure for 1 shelving unit | ||
Task 2 - | Task 2 - | ||
<br> | |||
---- | |||
Tasks In Progress: | Tasks In Progress: | ||
Task 1 - | Task 1 - Cut shelves for shelving unit | ||
Task 2 - | Task 2 - | ||
Line 29: | Line 31: | ||
Tasks to Complete: | Tasks to Complete: | ||
Task 1 - | Task 1 - Build second shelving unit | ||
Task 2 - Place Refelective Tape on poles | |||
Task 3 - Drill holes for rail alignment | |||
Task 4 - Create plates for rail rigidity | |||
Task 5 - Determine what to do for extra 2" pole length | |||
Task 6 - Wrap post bottoms with solid material | |||
Task | Task 7 - Mount post toppers | ||
Task 8 - Determine/Construct method to keep lane dividers in place | |||
Task 9 - Mounting system on player stations for power/connectivity | |||
Task 10 - Drill holes in each player station for cords | |||
Task 11 - Drill 1 hole in each piece of Lexan for securing | |||
Task 12 - Sand down inside of feeder plates | |||
<br> | |||
<br> | |||
---- | |||
Materials Needed: | Materials Needed: | ||
<br>Item 1 - | <br>Item 1 - 4x4s | ||
Item 2 - | Item 2 - Hardware for rails | ||
---- | |||
Images & Additional Updates: | Images & Additional Updates: | ||
(Make sure you are in the Rich Editor and use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. Sizing can be done using the length/width pixel size) | (Make sure you are in the Rich Editor and use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. Sizing can be done using the length/width pixel size) |
Latest revision as of 04:53, 9 February 2011
Members present: Jason, Manuel, Shayna
Mentors present: Amy
Members Attending Next Meeting:
Tasks Completed:
Task 1 - Built structure for 1 shelving unit
Task 2 -
Tasks In Progress:
Task 1 - Cut shelves for shelving unit
Task 2 -
--------------------------------------------------------------------------------
Tasks to Complete:
Task 1 - Build second shelving unit
Task 2 - Place Refelective Tape on poles
Task 3 - Drill holes for rail alignment
Task 4 - Create plates for rail rigidity
Task 5 - Determine what to do for extra 2" pole length
Task 6 - Wrap post bottoms with solid material
Task 7 - Mount post toppers
Task 8 - Determine/Construct method to keep lane dividers in place
Task 9 - Mounting system on player stations for power/connectivity
Task 10 - Drill holes in each player station for cords
Task 11 - Drill 1 hole in each piece of Lexan for securing
Task 12 - Sand down inside of feeder plates
Materials Needed:
Item 1 - 4x4s
Item 2 - Hardware for rails
Images & Additional Updates:
(Make sure you are in the Rich Editor and use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. Sizing can be done using the length/width pixel size)