FieldCrate (talk | contribs) (New page: Members present: <br>Members Attending Next Meeting: -------------------------------------------------------------------------------- Tasks Completed: Task 1 - Task 2 - ---...) |
Mechanical1 (talk | contribs) No edit summary |
||
(One intermediate revision by one other user not shown) | |||
Line 1: | Line 1: | ||
Members present: | Members present: Shayna and Manuel worked on chairman's and the robot | ||
Mentors present: Amy, Lloyd | |||
<br>Members Attending Next Meeting: | <br>Members Attending Next Meeting: | ||
Line 7: | Line 9: | ||
-------------------------------------------------------------------------------- | |||
-------------------------------------------------------------------------------- | |||
Tasks Completed: | Tasks Completed: | ||
Task 1 - | Task 1 - Create plates for rail rigidity | ||
Task 2 - Sort through things to sell at Rally<br> | |||
-------------------------------------------------------------------------------- | -------------------------------------------------------------------------------- | ||
Tasks In Progress: | Tasks In Progress: | ||
Line 29: | Line 41: | ||
Tasks to Complete: | Tasks to Complete: | ||
Task 1 - | Task 1 - Place Refelective Tape on poles | ||
Task 2 - Drill holes for rail alignment | |||
Task 3 - Determine what to do for extra 2" pole length | |||
Task 4 - Wrap post bottoms with solid material | |||
Task 5 - Mount post toppers | |||
Task 6 - Determine/Construct method to keep lane dividers in place | |||
Task 7 - Mounting system on player stations for power/connectivity | |||
Task 8 - Drill holes in each player station for cords | |||
Task 9 - Drill 1 hole in each piece of Lexan for securing | |||
Task 10 - Sand down inside of feeder plates | |||
Task 11 - Make sure we have enough Velcro | |||
Line 41: | Line 77: | ||
Materials Needed: | Materials Needed: | ||
<br>Item 1 - | <br>Item 1 - 4x4s | ||
Item 2 - Hardware for rails | |||
---- | |||
Images & Additional Updates: | Images & Additional Updates: | ||
(Make sure you are in the Rich Editor and use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. Sizing can be done using the length/width pixel size) | (Make sure you are in the Rich Editor and use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. Sizing can be done using the length/width pixel size) |
Latest revision as of 05:32, 11 February 2011
Members present: Shayna and Manuel worked on chairman's and the robot
Mentors present: Amy, Lloyd
Members Attending Next Meeting:
Tasks Completed:
Task 1 - Create plates for rail rigidity
Task 2 - Sort through things to sell at Rally
Tasks In Progress:
Task 1 -
Task 2 -
--------------------------------------------------------------------------------
Tasks to Complete:
Task 1 - Place Refelective Tape on poles
Task 2 - Drill holes for rail alignment
Task 3 - Determine what to do for extra 2" pole length
Task 4 - Wrap post bottoms with solid material
Task 5 - Mount post toppers
Task 6 - Determine/Construct method to keep lane dividers in place
Task 7 - Mounting system on player stations for power/connectivity
Task 8 - Drill holes in each player station for cords
Task 9 - Drill 1 hole in each piece of Lexan for securing
Task 10 - Sand down inside of feeder plates
Task 11 - Make sure we have enough Velcro
Materials Needed:
Item 1 - 4x4s
Item 2 - Hardware for rails
Images & Additional Updates: