2011:Field 1/20/2011: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
No edit summary
 
(3 intermediate revisions by the same user not shown)
Line 1: Line 1:
Members present:  
Members present: Jason, Manuel, Kieran, Shayna 
 
Mentors present: Amy, Lloyd 


<br>Members Attending Next Meeting:  
<br>Members Attending Next Meeting:  


 
----
 
 
 
--------------------------------------------------------------------------------


Tasks Completed:  
Tasks Completed:  


Task 1 -  
Task 1 - Interference fit the end plates onto pegs.<br>Task 2 - Cut 2x4s for player station walls. <br>Task 3 - Assemble 4 stop plates for tower assemblies. <br>
 
Task 2 -
 


 
Task 4 - Determine reflective tape part number and who we can buy it from. (See shopping list page.) <br><br>--------------------------------------------------------------------------------  
--------------------------------------------------------------------------------  


Tasks In Progress:  
Tasks In Progress:  


Task 1 -  
Task 1 - Assemble 3 more tower assemblies.


Task 2 -  
Task 2 -  


<br>--------------------------------------------------------------------------------  
----


Tasks to Complete:  
Tasks to Complete:  


Task 1 -  
Task 1 - Assemble 4 stop plates to poles.
 
Task 2- Cut pieces for player stations table.


Task 2 -  
Task 3 - Paint player station walls.


Task&nbsp;4 - Paint field elements.


----


Materials Needed:


<br>Item 1 - Field tape.


--------------------------------------------------------------------------------
Item 2 - Game pieces.


Materials Needed:
Item 3 - Reflective Tape.


<br>Item 1 -  
Item 4 - Hardware for player station walls, velcro.


Item 2 -
<br>


--------------------------------------------------------------------------------  
----


Images &amp; Additional Updates:  
<br>Images &amp; Additional Updates:  


(Make sure you are in the Rich Editor and use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. Sizing can be done using the length/width pixel size)
(Make sure you are in the Rich Editor and use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. Sizing can be done using the length/width pixel size)

Latest revision as of 05:43, 21 January 2011

Members present: Jason, Manuel, Kieran, Shayna 

Mentors present: Amy, Lloyd 


Members Attending Next Meeting:


Tasks Completed:

Task 1 - Interference fit the end plates onto pegs.
Task 2 - Cut 2x4s for player station walls.
Task 3 - Assemble 4 stop plates for tower assemblies.

Task 4 - Determine reflective tape part number and who we can buy it from. (See shopping list page.)

--------------------------------------------------------------------------------

Tasks In Progress:

Task 1 - Assemble 3 more tower assemblies.

Task 2 -


Tasks to Complete:

Task 1 - Assemble 4 stop plates to poles.

Task 2- Cut pieces for player stations table.

Task 3 - Paint player station walls.

Task 4 - Paint field elements.


Materials Needed:


Item 1 - Field tape.

Item 2 - Game pieces.

Item 3 - Reflective Tape.

Item 4 - Hardware for player station walls, velcro.




Images & Additional Updates:

(Make sure you are in the Rich Editor and use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. Sizing can be done using the length/width pixel size)