2011:Field 2/10/2011: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
No edit summary
 
Line 1: Line 1:
Members present:  
Members present: Shayna and Manuel worked on chairman's and the robot
 
Mentors present: Amy, Lloyd


<br>Members Attending Next Meeting:  
<br>Members Attending Next Meeting:  
Line 7: Line 9:




--------------------------------------------------------------------------------
 
 
 
 
 
 
--------------------------------------------------------------------------------  


Tasks Completed:  
Tasks Completed:  


Task 1 -  
Task 1 - Create plates for rail rigidity
 
Task 2 - Sort through things to sell at Rally<br>
 
 
 


Task 2 -






--------------------------------------------------------------------------------  
--------------------------------------------------------------------------------


Tasks In Progress:  
Tasks In Progress:  
Line 29: Line 41:
Tasks to Complete:  
Tasks to Complete:  


Task 1 -  
Task 1 - Place Refelective Tape on poles
 
Task 2 - Drill holes for rail alignment
 
Task&nbsp;3 - Determine what to do for extra 2" pole length
 
Task&nbsp;4 - Wrap post bottoms with solid material
 
Task&nbsp;5 - Mount post toppers
 
Task&nbsp;6 - Determine/Construct method to keep lane dividers in place
 
Task&nbsp;7 - Mounting system on player stations for power/connectivity
 
Task&nbsp;8 - Drill holes in each player station for cords
 
Task&nbsp;9 - Drill 1 hole in each piece of Lexan for securing
 
Task 10 - Sand down inside of feeder plates
 
Task 11 - Make sure we have enough Velcro
 
 
 
 
 


Task 2 -




Line 41: Line 77:
Materials Needed:  
Materials Needed:  


<br>Item 1 -  
<br>Item 1 - 4x4s
 
Item 2 - Hardware for rails
 


Item 2 -
----


--------------------------------------------------------------------------------


Images &amp; Additional Updates:  
Images &amp; Additional Updates:  


(Make sure you are in the Rich Editor and use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. Sizing can be done using the length/width pixel size)
(Make sure you are in the Rich Editor and use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. Sizing can be done using the length/width pixel size)

Latest revision as of 05:32, 11 February 2011

Members present: Shayna and Manuel worked on chairman's and the robot

Mentors present: Amy, Lloyd


Members Attending Next Meeting:







Tasks Completed:

Task 1 - Create plates for rail rigidity

Task 2 - Sort through things to sell at Rally





Tasks In Progress:

Task 1 -

Task 2 -


--------------------------------------------------------------------------------

Tasks to Complete:

Task 1 - Place Refelective Tape on poles

Task 2 - Drill holes for rail alignment

Task 3 - Determine what to do for extra 2" pole length

Task 4 - Wrap post bottoms with solid material

Task 5 - Mount post toppers

Task 6 - Determine/Construct method to keep lane dividers in place

Task 7 - Mounting system on player stations for power/connectivity

Task 8 - Drill holes in each player station for cords

Task 9 - Drill 1 hole in each piece of Lexan for securing

Task 10 - Sand down inside of feeder plates

Task 11 - Make sure we have enough Velcro







Materials Needed:


Item 1 - 4x4s

Item 2 - Hardware for rails




Images & Additional Updates:

(Make sure you are in the Rich Editor and use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. Sizing can be done using the length/width pixel size)