Members present:  
Members present: Shayna, Jason


<br>Members Attending Next Meeting:
Mentors present: Amy<br>


<br>Members Attending Next Meeting:








--------------------------------------------------------------------------------


Tasks Completed:  
<br>Tasks Completed:


Task 1 -  
Task 1 - Re-cut poles to 16 inches<br>


Task 2 -
Task 2 - Wrap post bottoms with solid material<br>
 
Task 3 - Sand down inside of feeder plates<br>


Task 4 - Make sure we have enough Velcro <br>




--------------------------------------------------------------------------------


Tasks In Progress:  
<br>Tasks In Progress:


Task 1 -  
Task 1 -


Task 2 -  
Task 2 -


<br>--------------------------------------------------------------------------------  
<br>--------------------------------------------------------------------------------


Tasks to Complete:  
Tasks to Complete:


Task 1 -  
Task 1 - Place Refelective Tape on poles


Task 2 -  
Task 2 - Drill holes for rail alignment


Task 3 - Mount post toppers


Task 4 - Determine/Construct method to keep lane dividers in place


Task 5 - Mounting system on player stations for power/connectivity


Task 6 - Drill holes in each player station for cords


--------------------------------------------------------------------------------
Task 7 - Drill 1 hole in each piece of Lexan for securing


Materials Needed:
Task 8 - Tape inside of feeder plates


<br>Item 1 -  
Task 9 - Sensor plate


Item 2 -
<br>


--------------------------------------------------------------------------------  
----


Images &amp; Additional Updates:  
Images &amp; Additional Updates:  


(Make sure you are in the Rich Editor and use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. Sizing can be done using the length/width pixel size)
(Make sure you are in the Rich Editor and use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. Sizing can be done using the length/width pixel size)

Latest revision as of 19:33, 12 February 2011

Members present: Shayna, Jason

Mentors present: Amy


Members Attending Next Meeting:




Tasks Completed:

Task 1 - Re-cut poles to 16 inches

Task 2 - Wrap post bottoms with solid material

Task 3 - Sand down inside of feeder plates

Task 4 - Make sure we have enough Velcro



Tasks In Progress:

Task 1 -

Task 2 -


--------------------------------------------------------------------------------

Tasks to Complete:

Task 1 - Place Refelective Tape on poles

Task 2 - Drill holes for rail alignment

Task 3 - Mount post toppers

Task 4 - Determine/Construct method to keep lane dividers in place

Task 5 - Mounting system on player stations for power/connectivity

Task 6 - Drill holes in each player station for cords

Task 7 - Drill 1 hole in each piece of Lexan for securing

Task 8 - Tape inside of feeder plates

Task 9 - Sensor plate