2009:Mechanical 2 - 1.11.09: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
m (Formatting)
 
(4 intermediate revisions by one other user not shown)
Line 1: Line 1:
XX.XX.2009  
01.11.2009  


'''Start time: '''<br>  
'''Start time:10:00 am&nbsp;'''<br>


'''End time: '''<br>  
'''End time: 4:00 pm '''<br>


'''Members present: '''<br>  
'''Members present: Cuyler&nbsp; ( Cuyler came in at noon and had to leave @ 3:30 ), Kyle Schuhart (&nbsp;Kyle came in at 10 and&nbsp;had to leave at 4)'''<br>


----
----


'''Tasks Completed:'''<br>  
'''Tasks Completed:'''<br>


*task<br>  
*Confirmation of motors<br>
*task
*Finished Drive Train (inventor braces that were not in original inventor file)


<br>  
<br>


----
----


'''Tasks In Progress:'''<br>  
'''Tasks In Progress:'''<br>


*task
*Frame work
*task


<br>  
<br>


----
----


'''Tasks to Complete: '''<br>  
'''Tasks to Complete: '''<br>


*task
*Finish Frame work
*task
*Place electrical board in inventor file


<br>  
<br>


----
----
Line 38: Line 37:
'''Images &amp; Additional Updates:'''  
'''Images &amp; Additional Updates:'''  


''(Use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. &nbsp;Sizing can be done using the length/width pixel size) ''
''(Use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. &nbsp;Sizing can be done using the length/width pixel size)''  


Mechanical 2 update,  
Mechanical 2 update,  

Latest revision as of 13:38, 14 November 2010

01.11.2009

Start time:10:00 am 

End time: 4:00 pm

Members present: Cuyler  ( Cuyler came in at noon and had to leave @ 3:30 ), Kyle Schuhart ( Kyle came in at 10 and had to leave at 4)


Tasks Completed:

  • Confirmation of motors
  • Finished Drive Train (inventor braces that were not in original inventor file)



Tasks In Progress:

  • Frame work



Tasks to Complete:

  • Finish Frame work
  • Place electrical board in inventor file



Images & Additional Updates:

(Use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above.  Sizing can be done using the length/width pixel size)

Mechanical 2 update,

We have chosen what motors we are using for each mechanism,

For the Hopper:  The trapdoor and lower collection blocker will be powered by a denso window motor(part #: 262100-3040)

For the ball conveyor we will be using two Rs-545 Banebots Motors with 25:1 reduction gearboxes

And for the Upper ball ejector we will be using the Fischer Price Motor (part #: 00968-2910) along with an AndyMark 67:1 gearbox


 Mechanical 2 Main Page