2011:Mechanical 1 1.26: Difference between revisions
From 1511Wookiee
Jump to navigationJump to search
(New page: = Attendance = '''Start time: ''' '''End time: ''' '''Members present: ''' '''Members Attending Next Meeting: ''' = Tasks Completed = *task **sub-task **sub-task *task = Tasks In Pr...) |
Drivetrain (talk | contribs) No edit summary |
||
(8 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
= Attendance = | = Attendance = | ||
'''Start time: ''' | '''Start time: 6:00''' | ||
'''End time: ''' | '''End time: 9:00''' | ||
'''Members present: ''' | '''Members present: ''' | ||
''' | '''Austin Lee''' | ||
'''Alex Vadas''' | |||
'''Elizabeth Mchesney''' | |||
'''Gabe Rosenburg''' | |||
'''Kyle Schuhart''' | |||
'''Tom Murphy''' | |||
'''Members Attending Next Meeting: ''' | |||
'''All''' | |||
* | = Tasks Completed<br> = | ||
** | |||
** | *Finished building Inventor Mini-bot (expect Pictures soon) | ||
* | *Finished applying Tusks to Robot | ||
*Determined between the two mech teams that the interface between the deployer and mounting it on the robot will be handled by the Mechanical Arm Team | |||
*Has achieved weight goal of 10-12 lbs. | |||
*[[Image:Minibot_Bottom_Iso_Open.jpg]][[Image:Minibot_Bottom_Open.jpg]][[Image:Minibot_Rear_Iso_Closed.jpg]][[Image:Closed_Front_View_update.jpg]][[Image:Base_Closed_View_update.jpg]][[Image:Minibot_Rear_Iso_Open.jpg]][[Image:Minibot_Top_Closed.jpg]][[Image:Minibot_Top_Open.jpg]] | |||
= Tasks In Progress = | |||
*Getting Acurate IDW's so we can build parts we need | |||
*Uploading pictures<br> | |||
*Deployer Model is 90% complete | |||
*Looked over with other mech team | |||
[[Image:Deployer_Iso_Top_Ext.jpg]][[Image:Deployer_Iso_Top_Retract.jpg]] | |||
[[Image:Deployer_Side_Retract.jpg]] | |||
[[Image:Deployer_Top_Retract.jpg]] | |||
[[Image:Deployer_Top_View_Ext.jpg]] | |||
= Tasks to Complete = | |||
*Building some of the extra parts we need | |||
= Materials Needed = | |||
*Paper, aluminum (already aquired)<br> |
Latest revision as of 16:47, 27 January 2011
Attendance
Start time: 6:00
End time: 9:00
Members present:
Austin Lee
Alex Vadas
Elizabeth Mchesney
Gabe Rosenburg
Kyle Schuhart
Tom Murphy
Members Attending Next Meeting:
All
Tasks Completed
- Finished building Inventor Mini-bot (expect Pictures soon)
- Finished applying Tusks to Robot
- Determined between the two mech teams that the interface between the deployer and mounting it on the robot will be handled by the Mechanical Arm Team
- Has achieved weight goal of 10-12 lbs.
Tasks In Progress
- Getting Acurate IDW's so we can build parts we need
- Uploading pictures
- Deployer Model is 90% complete
- Looked over with other mech team
Tasks to Complete
- Building some of the extra parts we need
Materials Needed
- Paper, aluminum (already aquired)