2011:Mechanical 2 2.6: Difference between revisions
(New page: = Attendance = '''Start time: ''' '''End time: ''' '''Members present: ''' '''Members Attending Next Meeting: ''' = Tasks Completed = *task **sub-task **sub-task *task = Tasks In Pr...) |
Mechanical2 (talk | contribs) No edit summary |
||
(8 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
= Attendance = | = Attendance = | ||
'''Start time: ''' | '''Start time: ''' | ||
'''End time: ''' | '''End time: ''' | ||
'''Members present: ''' | '''Members present:Brianna, Ciana, Alex, Mr Kanzler, Mr Wolf''' | ||
'''Members Attending Next Meeting: ''' | '''Members Attending Next Meeting: ''' | ||
= Tasks Completed = | = Tasks Completed = | ||
*task | |||
**sub-task | |||
**sub-task | |||
*task | *task | ||
= Tasks In Progress = | = Tasks In Progress = | ||
- Do we have a sprocket guard figured out yet for the top of the arm?<br> Saftey in never second to anything, but guard designs often require a hands on approach and should be mostly simple parts we can make.<br> | |||
'''- Deployer, arm park side side, shield and support ALEX need 4 drawings'''<br> '''- Draw bridge TOM / Alex'''<br> | |||
Draw bridge deploy<br>- Side electrical board supports, and place board CIANNA<br>- Belly pan | |||
'''1- sensor brackets and flags 3 Brianna''' | |||
'''- arm release trigge'''r | |||
- parts inventory | |||
2- jack shaft details | |||
encoder on the jack shaft | |||
- ASSEMBLE | |||
- put in electrical components and weight cg work.CIANNA | |||
'''3- MINI BOT HOLDER''' | |||
'''4- Light tower mount. Gabe''' | |||
'''- Deploy side deployer mount, sheet metal'''<br> | |||
'''<br>''' | |||
<br> | |||
= Tasks to Complete = | = Tasks to Complete = | ||
*task | *task | ||
**sub-task | **sub-task | ||
**sub-task | **sub-task | ||
*task | *task | ||
= Materials Needed = | = Materials Needed = | ||
*task | *task | ||
**sub-task | **sub-task | ||
**sub-task | **sub-task | ||
*task | *task |
Latest revision as of 11:35, 6 February 2011
Attendance
Start time:
End time:
Members present:Brianna, Ciana, Alex, Mr Kanzler, Mr Wolf
Members Attending Next Meeting:
Tasks Completed
- task
- sub-task
- sub-task
- task
Tasks In Progress
- Do we have a sprocket guard figured out yet for the top of the arm?
Saftey in never second to anything, but guard designs often require a hands on approach and should be mostly simple parts we can make.
- Deployer, arm park side side, shield and support ALEX need 4 drawings
- Draw bridge TOM / Alex
Draw bridge deploy
- Side electrical board supports, and place board CIANNA
- Belly pan
1- sensor brackets and flags 3 Brianna
- arm release trigger
- parts inventory
2- jack shaft details
encoder on the jack shaft
- ASSEMBLE
- put in electrical components and weight cg work.CIANNA
3- MINI BOT HOLDER
4- Light tower mount. Gabe
- Deploy side deployer mount, sheet metal
Tasks to Complete
- task
- sub-task
- sub-task
- task
Materials Needed
- task
- sub-task
- sub-task
- task