2011:Mechanical 2 1.15: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
No edit summary
No edit summary
 
(3 intermediate revisions by the same user not shown)
Line 44: Line 44:
*     B: 10"  
*     B: 10"  
*     D: 2"  
*     D: 2"  
*Finshed game peices on inventor  
*Finshed game peices on inventor    
*[[Image:0114012040.jpg]]
 
= [[Image:0114012118.jpg]] =


= Tasks In Progress  =
= Tasks In Progress  =
Line 60: Line 63:
*tbd
*tbd


= '''DAY 2: 1/15/11'''  =
== Attendance  ==
'''Start time: '''11:00 am
'''End time: ''' 9:00 p.m.
'''Members present:'''
Brianna M.
Ciana R.
Jon G.
Alex W.
Mr. K.


Mrs. W.


= Day 2<br> =
Mr. W.


'''Start Time''':
<br>'''Members Attending Next Meeting:'''
 
Brianna M.
 
Ciana R.
 
Alex W.
 
Jon G.
 
Mr. W.
 
Mrs. W.
 
Mr. K.<br>&nbsp;'''Tasks Completed'''
 
*Using same idea as yesterday, but now using wheels instead of tubing
*Determined angle to be 50 degrees
*Determined height from ground, 1 1/2" which worked much better than 2"
*speeed of wheels
 
'''Tasks In Progress'''
 
*Finding shapes for frame
*Roughing up tires with sandpaper to increase coefficent friction
*Telescope vs. folding for starting configuringtion <br>
 
'''Tasks to Complete'''
 
*tbd


== Attendence ==
'''Materials Needed'''


*Jon G.
*tbd<br>
*Brianna M.
*Ciana R.
*Alex W.
*Mr. K.
*Mr. W.
*Mrs. W.

Latest revision as of 15:58, 16 January 2011

Attendance

Start time: 6:00

End time: 9:30

Date: 1/14/11

Members present:

Brianna M.

Ciana R.

Alex W.

Mr. W

Mrs. W

Members Attending Next Meeting:

Brianna M.

Ciana R.

Alex W

Mr. W

Mrs. W

Mr. K.

Tasks Completed

  • Determined length and angle of gripper   
  • 1st test 
  •       A: 8" (no) 7"(no) 6" ( worked poorly, and we had to push the tube in)
  •       B: 8"
  •       D: 2"
  • 2nd test:
  •       A: 8"(no) 7"(no) 6"(worked poorly, and we had to push the tube in)
  •      B: 10"
  •      D: 2"
  • Finshed game peices on inventor  
  • 0114012040.jpg

0114012118.jpg

Tasks In Progress

  • tubbing or not
  • manipulator prototyping  
  • sketching manipulators

Tasks to Complete

  • tbd

Materials Needed

  • tbd

DAY 2: 1/15/11

Attendance

Start time: 11:00 am

End time:  9:00 p.m.

Members present:

Brianna M.

Ciana R.

Jon G.

Alex W.

Mr. K.

Mrs. W.

Mr. W.


Members Attending Next Meeting:

Brianna M.

Ciana R.

Alex W.

Jon G.

Mr. W.

Mrs. W.

Mr. K.
 Tasks Completed

  • Using same idea as yesterday, but now using wheels instead of tubing
  • Determined angle to be 50 degrees
  • Determined height from ground, 1 1/2" which worked much better than 2"
  • speeed of wheels

Tasks In Progress

  • Finding shapes for frame
  • Roughing up tires with sandpaper to increase coefficent friction
  • Telescope vs. folding for starting configuringtion

Tasks to Complete

  • tbd

Materials Needed

  • tbd