2011:FieldMasterTaskList: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
No edit summary
No edit summary
 
(17 intermediate revisions by the same user not shown)
Line 1: Line 1:
== 2011 Game Elements ==
= 2011 Game Elements =


== Alliance Station Walls ==
*<strike>Finish cutting PVC</strike>
*Glue remaining PVC sections together
*<strike>Attach retention plates to PVC outriggers</strike>
*<strike>Finish cutting tower base supports</strike>
*<strike>Assemble 3 remaining tower bases</strike>
*<strike>Cut out the hole in the 1 remaining floor protector</strike>
*<strike>Order game pieces </strike>
**<strike>14 Red Triangle</strike>
**<strike>14 Blue Square</strike>
**<strike>14 White Circle</strike>
**<strike>8 Yellow Ubertube</strike>
*<strike>Cut Scrap Pieces of carpet to cover the floor protectors</strike>
*<strike>Cut plywood pieces for the feeder slots in alliance walls</strike>


*Cut 2x4's to proper length
<br>
**Wall Uprights
***Wall Cross Members
***Player Station Legs
***Player Station Frames
*Cut lywood player station tops
*Cut plywood corner brackets
*Paint alliance station wall bottoms


== Other Items ==
= Pre-Rally Items =
*Drill holes for rail alignment
*Mount post toppers
*Mounting system on player stations for power/connectivity
*Drill holes in each player station for cords
*Drill 1 hole in each piece of Lexan for securing
 
<br>
 
= Alliance Station Walls  =
 
*<strike>Cut 2x4's to proper length </strike>
**<strike>Wall Uprights</strike>
**<strike>Wall Cross Members</strike>
**<strike>Player Station Legs</strike>
**<strike>Player Station Frames </strike>
*<strike>Cut plywood player station tops</strike>
*<strike>Cut plywood corner brackets</strike>
*<strike>Assemble the sections of the new alliance station walls</strike>
 
== Hardware Connections  ==
 
*<strike>Pre-fit lexan panels</strike>
*<strike>Pre-drill holes for connecting bolts</strike>
*<strike>Pre-fit player station assemblies</strike>
*<strike>Put together entire wall assembly prior to Rally</strike>
 
<br>
 
= Painting  =
 
*<strike>Paint alliance station wall bottoms</strike>
*<strike>Paint alliance station wall frames</strike>
*<strike>Paint tower bases</strike>
*<strike>Paint lane dividers</strike>
*<strike>Paint Player Station Legs and Frames</strike>
 
<br>
 
= Other Items =
 
*Design New Pit Set-up
*<strike>Repair the damaged areas of the crate</strike>
*<strike>Set-up the cart for the 2011 robot </strike>
*Clean up scrap materials in the new closet
*Organize the new closet
*<strike>Look into new ways to build field rails for Rally</strike>

Latest revision as of 21:50, 13 February 2011

2011 Game Elements

  • Finish cutting PVC
  • Glue remaining PVC sections together
  • Attach retention plates to PVC outriggers
  • Finish cutting tower base supports
  • Assemble 3 remaining tower bases
  • Cut out the hole in the 1 remaining floor protector
  • Order game pieces
    • 14 Red Triangle
    • 14 Blue Square
    • 14 White Circle
    • 8 Yellow Ubertube
  • Cut Scrap Pieces of carpet to cover the floor protectors
  • Cut plywood pieces for the feeder slots in alliance walls


Pre-Rally Items

  • Drill holes for rail alignment
  • Mount post toppers
  • Mounting system on player stations for power/connectivity
  • Drill holes in each player station for cords
  • Drill 1 hole in each piece of Lexan for securing


Alliance Station Walls

  • Cut 2x4's to proper length
    • Wall Uprights
    • Wall Cross Members
    • Player Station Legs
    • Player Station Frames
  • Cut plywood player station tops
  • Cut plywood corner brackets
  • Assemble the sections of the new alliance station walls

Hardware Connections

  • Pre-fit lexan panels
  • Pre-drill holes for connecting bolts
  • Pre-fit player station assemblies
  • Put together entire wall assembly prior to Rally


Painting

  • Paint alliance station wall bottoms
  • Paint alliance station wall frames
  • Paint tower bases
  • Paint lane dividers
  • Paint Player Station Legs and Frames


Other Items

  • Design New Pit Set-up
  • Repair the damaged areas of the crate
  • Set-up the cart for the 2011 robot
  • Clean up scrap materials in the new closet
  • Organize the new closet
  • Look into new ways to build field rails for Rally