2011:Electrical Main 1.23: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
No edit summary
No edit summary
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
'''Start time: 10:30'''  
'''Start time: 10:30'''  


'''End time: '''  
'''End time:  6:30'''


'''Members present: Alex Rozanov, Matthieu Dora '''  
'''Members present: Alex Rozanov, Matthieu Dora, Christian S, Dave B'''


'''Members Attending Next Meeting: Alex Rozanov, Dave B '''
'''Members Attending Next Meeting: Alex Rozanov, Dave B '''


= Tasks Completed =
= Tasks Completed =


*task
*Selected encoders
**sub-task
**We chose the E4P with 360 CPR disk
**sub-task
**Is able to rotate with 0.5 degrees of accuracy if using quadrature output
*task
**Using two encoders for redundancy
*Created schematics for photoelectric sensor (Banner)
 
[[Image:PhotoSensorSet2.png]]
 
*LED 2 is just an adjustment LED


= Tasks In Progress =  
= Tasks In Progress =  

Latest revision as of 20:53, 25 January 2011

Attendance

Start time: 10:30

End time:  6:30

Members present: Alex Rozanov, Matthieu Dora, Christian S, Dave B

Members Attending Next Meeting: Alex Rozanov, Dave B

Tasks Completed

  • Selected encoders
    • We chose the E4P with 360 CPR disk
    • Is able to rotate with 0.5 degrees of accuracy if using quadrature output
    • Using two encoders for redundancy
  • Created schematics for photoelectric sensor (Banner)

PhotoSensorSet2.png

  • LED 2 is just an adjustment LED

Tasks In Progress

  • task
    • sub-task
    • sub-task
  • task

Tasks to Complete

  • task
    • sub-task
    • sub-task
  • task

Materials Needed

  • task
    • sub-task
    • sub-task
  • task