2011:Electrical Main 1.26: Difference between revisions
From 1511Wookiee
Jump to navigationJump to search
No edit summary |
No edit summary |
||
(2 intermediate revisions by one other user not shown) | |||
Line 1: | Line 1: | ||
= Attendance = | = Attendance = | ||
'''Start time: 6:00''' | '''Start time: 6:00''' | ||
'''End time: 9:00''' | '''End time: 9:00''' | ||
'''Members present: Vaughn, Alex R., Dean S., Dave S., | '''Members present: Vaughn, Alex R., Dean S., Dave S., Christian S.''' | ||
'''Members Attending Next Meeting:''' | '''Members Attending Next Meeting:''' | ||
Line 12: | Line 12: | ||
*repaired RS-232/CAN cable on mock board and installed D-connector shell. | *repaired RS-232/CAN cable on mock board and installed D-connector shell. | ||
*anylize material [[Stress]] capability<br> | *anylize material [[2011:Stress]] capability<br> | ||
= Tasks In Progress = | = Tasks In Progress = | ||
* | *starting building/testing homemade photoelectric sensor | ||
*task | *task | ||
Latest revision as of 11:08, 6 January 2012
Attendance
Start time: 6:00
End time: 9:00
Members present: Vaughn, Alex R., Dean S., Dave S., Christian S.
Members Attending Next Meeting:
Tasks Completed
- repaired RS-232/CAN cable on mock board and installed D-connector shell.
- anylize material 2011:Stress capability
Tasks In Progress
- starting building/testing homemade photoelectric sensor
- task
Tasks to Complete
- task
- sub-task
- sub-task
- task
Materials Needed
- task
- sub-task
- sub-task
- task