2011:Field 2/1/2011: Difference between revisions
Leadership (talk | contribs) No edit summary |
Mechanical1 (talk | contribs) No edit summary |
||
(One intermediate revision by one other user not shown) | |||
Line 1: | Line 1: | ||
Members present: Shayna, Manuel, Jason, Kieren, Amy | Members present: Shayna, Manuel, Jason, Kieren, Amy | ||
<br>Members Attending Next Meeting: | <br>Members Attending Next Meeting: | ||
<br> | |||
<br> | |||
---- | |||
Tasks Completed: | Tasks Completed: | ||
Task 1 - Cut Feeder station openings | Task 1 - Cut Feeder station openings | ||
Task 2 - Cut plywood bottoms for element sections of walls | Task 2 - Cut plywood bottoms for element sections of walls | ||
<br> | |||
---- | |||
Tasks In Progress: | |||
Task 1 - Widen holes for alliance wall bolts | |||
Task | Task 2 - Attach feeder station slots to walls | ||
Task | Task 3- Attach plywood bottoms for element section of walls. | ||
<br>-------------------------------------------------------------------------------- | <br>-------------------------------------------------------------------------------- | ||
Line 29: | Line 31: | ||
Tasks to Complete: | Tasks to Complete: | ||
Task 1 - Build storage bin for 2x4's | Task 1 - Build storage bin for 2x4's | ||
Task 2 - Determine new field rail connections | |||
<br> | |||
<br> | |||
---- | |||
Materials Needed: | Materials Needed: | ||
<br>Item 1 - See shopping list | <br>Item 1 - See shopping list | ||
<br> | |||
---- | |||
Images & Additional Updates: | Images & Additional Updates: | ||
(Make sure you are in the Rich Editor and use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. Sizing can be done using the length/width pixel size) | (Make sure you are in the Rich Editor and use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. Sizing can be done using the length/width pixel size) |
Latest revision as of 13:39, 2 February 2011
Members present: Shayna, Manuel, Jason, Kieren, Amy
Members Attending Next Meeting:
Tasks Completed:
Task 1 - Cut Feeder station openings
Task 2 - Cut plywood bottoms for element sections of walls
Tasks In Progress:
Task 1 - Widen holes for alliance wall bolts
Task 2 - Attach feeder station slots to walls
Task 3- Attach plywood bottoms for element section of walls.
--------------------------------------------------------------------------------
Tasks to Complete:
Task 1 - Build storage bin for 2x4's
Task 2 - Determine new field rail connections
Materials Needed:
Item 1 - See shopping list
Images & Additional Updates:
(Make sure you are in the Rich Editor and use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. Sizing can be done using the length/width pixel size)