2011:Controls 2.3: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
No edit summary
No edit summary
 
(One intermediate revision by the same user not shown)
Line 15: Line 15:
= Tasks In Progress  =
= Tasks In Progress  =


*Schematics need to be draw up for formal wire layout of control undercarriage<br>
*Schematics need to be draw up for formal wire layout of control undercarriage<br>  
**Addition of potentiometers to paper stencil <br>
**Addition of potentiometers to paper stencil <br>  
**Publish IO maps to wiki<br>  
**Publish I/O maps to wiki<br>  
*task
*task


Line 23: Line 23:


*Figure out wiring for control system&nbsp;  
*Figure out wiring for control system&nbsp;  
**figure out additional switch functions<br>
**Figure out additional switch functions<br>  
**Figure out method to secure classmate computer<br>  
**Figure out method to secure classmate computer<br>  
*Mount preset buttons onto board<br>
*Mount preset buttons onto board<br>
Line 30: Line 30:


*Need preset buttons&nbsp;  
*Need preset buttons&nbsp;  
**sheet metal prototype
**sheet metal prototype  
**sub-task  
**sub-task  
*task
*task

Latest revision as of 18:28, 3 February 2011

Attendance

Start time: 6PM

End time:

Members present: Crystal, JP, Quinten, Gafei

Members Attending Next Meeting:

Tasks Completed

  • The functional block diagram is completed in electrical form. It is listed below:
    Control wire layout.jpg

Tasks In Progress

  • Schematics need to be draw up for formal wire layout of control undercarriage
    • Addition of potentiometers to paper stencil
    • Publish I/O maps to wiki
  • task

Tasks to Complete

  • Figure out wiring for control system 
    • Figure out additional switch functions
    • Figure out method to secure classmate computer
  • Mount preset buttons onto board

Materials Needed

  • Need preset buttons 
    • sheet metal prototype
    • sub-task
  • task