2011:Mechanical 2 2.5: Difference between revisions
Mechanical2 (talk | contribs) No edit summary |
Mechanical2 (talk | contribs) No edit summary |
||
(7 intermediate revisions by the same user not shown) | |||
Line 5: | Line 5: | ||
'''End time: ''' | '''End time: ''' | ||
'''Members present: ''' | '''Members present: Alex W, Cianna R, Brianna M,Jacob K, Jhnathan G, Mr K, Mr W,''' | ||
'''Members Attending Next Meeting: ''' | '''Members Attending Next Meeting: ''' | ||
Line 17: | Line 17: | ||
= Tasks In Progress = | = Tasks In Progress = | ||
* | * | ||
= '''Sensor requrements. DB, and Dave S.''' = | |||
*'''arm park sensor, when parked it's blocked.''' | |||
*'''2 playing position, over travel sensors, goes blocked when arm is too low.''' | |||
*<br> | |||
= Tasks to Complete = | |||
*<br> | |||
- Do we have a sprocket guard figured out yet for the top of the arm?<br> - Saftey in never second to anything, but guard designs often require a hands on approach and should be mostly simple parts we can make. <br>'''5- We need to finalize the release mechanism for the deployer.!!!!!!!!!!!!!!!!!!!!''' | |||
7 Have we considered a interchangeable deployer plate so that we can accommodate other Minibots? | - We don’t have a final design for the tusks or how they will be deployed yet.7 Have we considered a interchangeable deployer plate so that we can accommodate other Minibots? | ||
'' - Deployer park side side shield A ALEX done<br> - Deployer park side side shield B ALEX done''<br> '''- Drawbridge TOM'''<br> '''- Side electrical board supports, and place board CIANNA'''<br> - Belly pan | |||
1- sensor brackets and flags 3 | |||
- arm release trigger | |||
- parts inventory | |||
2- jack shaft details | |||
encoder on the jack shaft | encoder on the jack shaft <br> | ||
- ASSEMBLE | |||
'''- put in electrical components and weight cg work.CIANNA''' | |||
''' | '''3- MINI BOT HOLDER''' | ||
4- Light tower mount. | |||
<br> | |||
= Materials Needed = | |||
<br> | *<br> | ||
= | = '''ORDER BELT''' = | ||
* | *<br> | ||
Latest revision as of 16:53, 5 February 2011
Attendance
Start time:
End time:
Members present: Alex W, Cianna R, Brianna M,Jacob K, Jhnathan G, Mr K, Mr W,
Members Attending Next Meeting:
Tasks Completed
- task
- sub-task
- sub-task
- task
Tasks In Progress
Sensor requrements. DB, and Dave S.
- arm park sensor, when parked it's blocked.
- 2 playing position, over travel sensors, goes blocked when arm is too low.
Tasks to Complete
- Do we have a sprocket guard figured out yet for the top of the arm?
- Saftey in never second to anything, but guard designs often require a hands on approach and should be mostly simple parts we can make.
5- We need to finalize the release mechanism for the deployer.!!!!!!!!!!!!!!!!!!!!
- We don’t have a final design for the tusks or how they will be deployed yet.7 Have we considered a interchangeable deployer plate so that we can accommodate other Minibots?
- Deployer park side side shield A ALEX done
- Deployer park side side shield B ALEX done
- Drawbridge TOM
- Side electrical board supports, and place board CIANNA
- Belly pan
1- sensor brackets and flags 3
- arm release trigger
- parts inventory
2- jack shaft details
encoder on the jack shaft
- ASSEMBLE
- put in electrical components and weight cg work.CIANNA
3- MINI BOT HOLDER
4- Light tower mount.