2011:Mechanical 2 2.5: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
No edit summary
No edit summary
 
(3 intermediate revisions by the same user not shown)
Line 5: Line 5:
'''End time: '''  
'''End time: '''  


'''Members present: '''  
'''Members present: Alex W, Cianna R, Brianna M,Jacob K, Jhnathan G, Mr K, Mr W,'''  


'''Members Attending Next Meeting: '''  
'''Members Attending Next Meeting: '''  
Line 18: Line 18:
= Tasks In Progress  =
= Tasks In Progress  =


*arm park sensor,  when parked it's blocked.  
*
*2 playing position over travel sensors,  goes blocked when arm is too low.  
 
*task
= '''Sensor requrements.  DB, and Dave S.'''  =
 
*'''arm park sensor,  when parked it's blocked.'''
*'''2 playing position, over travel sensors,  goes blocked when arm is too low.'''
*<br>


= Tasks to Complete  =
= Tasks to Complete  =
Line 26: Line 30:
*<br>
*<br>


1&nbsp; Do we have a sprocket guard figured out yet for the top of the arm?<br> ---Saftey in never second to anything, but guard designs often require a hands on approach and should be mostly simple parts we can make. <br> 4'''&nbsp; We need to finalize the release mechanism for the deployer.!!!!!!!!!!!!!!!!!!!!'''  
- Do we have a sprocket guard figured out yet for the top of the arm?<br> -&nbsp; Saftey in never second to anything, but guard designs often require a hands on approach and should be mostly simple parts we can make. <br>'''5- &nbsp; We need to finalize the release mechanism for the deployer.!!!!!!!!!!!!!!!!!!!!'''  
 
5&nbsp;&nbsp; We don’t have a final design for the tusks or how they will be deployed yet.


7 Have we considered a interchangeable deployer plate so that we can accommodate other Minibots?  
&nbsp;- We don’t have a final design for the tusks or how they will be deployed yet.7 Have we considered a interchangeable deployer plate so that we can accommodate other Minibots?  


4Deployer park side side shield A&nbsp;&nbsp; ALEX done<br> 5 Deployer park side side shield B&nbsp; ALEX done<br> '''6 Drawbridge TOM'''<br> '''7 Side electrical board supports, and place board CIANNA'''<br> 8 Belly pan  
''&nbsp;- Deployer park side side shield A&nbsp;&nbsp; ALEX done<br> -&nbsp; Deployer park side side shield B&nbsp; ALEX done''<br>&nbsp; '''- Drawbridge TOM'''<br> '''-&nbsp; Side electrical board supports, and place board CIANNA'''<br> -&nbsp; Belly pan  


sensor brackets and flags 3  
1-&nbsp; sensor brackets and flags 3  


arm release trigger  
- arm release trigger  


parts inventory  
- parts inventory  


encoder on the jack shaft  
2-&nbsp; jack shaft details


jack shaft details
&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; encoder on the jack shaft <br>


ASSEMBLE  
&nbsp;-&nbsp; ASSEMBLE  


'''put in electrical components and weight cg work.CIANNA'''  
'''-&nbsp;&nbsp; put in electrical components and weight cg work.CIANNA'''  


'''MINI BOT HOLDER'''  
'''3-&nbsp; MINI BOT HOLDER'''  


Light tower mount.  
4-&nbsp; Light tower mount.  


<br>  
<br>  
Line 56: Line 58:
= Materials Needed  =
= Materials Needed  =


*
*<br>


= '''ORDER BELT'''  =
= '''ORDER BELT'''  =


*
*<br>

Latest revision as of 17:53, 5 February 2011

Attendance

Start time:

End time:

Members present: Alex W, Cianna R, Brianna M,Jacob K, Jhnathan G, Mr K, Mr W,

Members Attending Next Meeting:

Tasks Completed

  • task
    • sub-task
    • sub-task
  • task

Tasks In Progress

Sensor requrements.  DB, and Dave S.

  • arm park sensor,  when parked it's blocked.
  • 2 playing position, over travel sensors,  goes blocked when arm is too low.

Tasks to Complete


- Do we have a sprocket guard figured out yet for the top of the arm?
-  Saftey in never second to anything, but guard designs often require a hands on approach and should be mostly simple parts we can make.
5-   We need to finalize the release mechanism for the deployer.!!!!!!!!!!!!!!!!!!!!

 - We don’t have a final design for the tusks or how they will be deployed yet.7 Have we considered a interchangeable deployer plate so that we can accommodate other Minibots?

 - Deployer park side side shield A   ALEX done
-  Deployer park side side shield B  ALEX done

  - Drawbridge TOM
-  Side electrical board supports, and place board CIANNA
-  Belly pan

1-  sensor brackets and flags 3

- arm release trigger

- parts inventory

2-  jack shaft details

       encoder on the jack shaft

 -  ASSEMBLE

-   put in electrical components and weight cg work.CIANNA

3-  MINI BOT HOLDER

4-  Light tower mount.


Materials Needed


ORDER BELT