2011:Mechanical 2 2.8: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
No edit summary
No edit summary
 
(One intermediate revision by the same user not shown)
Line 33: Line 33:
''&nbsp;- put in electrical components and weight cg work.CIANN. &nbsp;DONE.''<br>  
''&nbsp;- put in electrical components and weight cg work.CIANN. &nbsp;DONE.''<br>  


'''4- Light tower mount. Gab'''e
'''''4- Light tower mount. Ga'''''<b>be</b>


'''&nbsp;- Deploy side deployer mount, sheet metal'''
'''&nbsp;- Deploy side deployer mount, sheet metal'''  


'''&nbsp;- Redesign Arm shoulder support stiffener rear'''  
'''&nbsp;- Redesign Arm shoulder support stiffener rear'''  

Latest revision as of 17:59, 8 February 2011

Attendance

Start time:

End time:

Members present:

Members Attending Next Meeting:

Tasks Completed

   - Do we have a sprocket guard figured out yet for the top of the arm?
Saftey in never second to anything, but guard designs often require a hands on approach and should be mostly simple parts we can make.

 - Deployer, arm park side side, shield and support ALEX need 4 drawings  DONE.
 - Draw bridge TOM / Alex.  DONE.

  - Draw bridge deploy

3- MINI BOT HOLDER
 - Side electrical board supports, and place board CIANNA
 - Belly pan

1- sensor brackets and flags 3 Brianna

 - arm release trigger

 - parts inventory

2- jack shaft details

                encoder on the jack shaft

 - ASSEMBLE

 - put in electrical components and weight cg work.CIANN.  DONE.

4- Light tower mount. Gabe

 - Deploy side deployer mount, sheet metal

 - Redesign Arm shoulder support stiffener rear

Tasks In Progress

  • task
    • sub-task
    • sub-task
  • task

Tasks to Complete

  • task
    • sub-task
    • sub-task
  • task

Materials Needed

  • task
    • sub-task
    • sub-task
  • task