2011:Controls 2.11: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
No edit summary
No edit summary
 
(3 intermediate revisions by the same user not shown)
Line 12: Line 12:
= Tasks Completed  =
= Tasks Completed  =


*task
*Painted all sides of the controls box
**sub-task
**Stenciled words and tanks on the box!
**sub-task
*Wired more stuff for the Cyprus
*task


= Tasks In Progress  =
= Tasks In Progress  =


*task
*Define stenciled art with 3d paint
**sub-task
*Stencil Thunderbolts
**sub-task
*Solder all further needed connections
*task


= Tasks to Complete  =
= Tasks to Complete  =


*task
*The controls.
**sub-task
**sub-task
*task


= Materials Needed  =
= Materials Needed  =


*task
*Red or white or black 3d paint.
**sub-task
**sub-task
*task
 
<!-- TEMPLATE: END COPYING AT THIS LINE -->
 
[[Template:EngineeringNotebook|Test Engineering Notebook Template]]<br>

Latest revision as of 19:45, 11 February 2011

Attendance

Start time: 6pm

End time: 12am

Members present: Rachel, JP, Crystal, Gafei

Members Attending Next Meeting:Rachel, Crystal, JP, Gafei, Eric

Tasks Completed

  • Painted all sides of the controls box
    • Stenciled words and tanks on the box!
  • Wired more stuff for the Cyprus

Tasks In Progress

  • Define stenciled art with 3d paint
  • Stencil Thunderbolts
  • Solder all further needed connections

Tasks to Complete

  • The controls.

Materials Needed

  • Red or white or black 3d paint.