2013:Climber 02.05: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
No edit summary
 
No edit summary
 
(3 intermediate revisions by the same user not shown)
Line 1: Line 1:
= Attendance =
= Attendance =


'''Start time: '''
'''Start time:'''


'''End time: '''
'''End time:'''


'''Members present: '''
'''Members present:'''


'''Members Attending Next Meeting: '''
'''Members Attending Next Meeting:'''


= Tasks Completed =
= Tasks Completed =
Line 17: Line 16:
*task
*task


= Tasks In Progress =  
= Tasks In Progress =


*task
*task
Line 25: Line 24:


= Tasks to Complete =
= Tasks to Complete =
<div>Tom C - TLC for trannys and assembly with motors&nbsp;</div><div>Matt - Bumper design review</div><div>Alex - Climber release mechanism</div><div>Alex - Restraining mechanism for arms</div><div>Dave S. - Sensors for arms and shafts. (Need part numbers so we can start design on 9 sensor mounts)</div><div>Fabricate parts for black arm cross member&nbsp;</div><div>Strong back for elevator shafts (Have design need model)</div><div>Combine all subteams parts and design the CG to be within +/- one inch from bot centerline</div><div>Belay attachment points</div><div>skid plate manfacture</div>
'''TEST on pyramid&nbsp;'''
<div>Anti backlash mechanism</div><div>Brianna- Design the cross member with leg guide for Red arms and Black arms</div><div>Spacers for the side of the hooks, between the arm and the hook? &nbsp;(Decide if needed during testing)</div>


*task
**sub-task
**sub-task
*task


= Materials Needed =
= Materials Needed =

Latest revision as of 17:12, 5 February 2013

Attendance

Start time:

End time:

Members present:

Members Attending Next Meeting:

Tasks Completed

  • task
    • sub-task
    • sub-task
  • task

Tasks In Progress

  • task
    • sub-task
    • sub-task
  • task

Tasks to Complete

Tom C - TLC for trannys and assembly with motors 
Matt - Bumper design review
Alex - Climber release mechanism
Alex - Restraining mechanism for arms
Dave S. - Sensors for arms and shafts. (Need part numbers so we can start design on 9 sensor mounts)
Fabricate parts for black arm cross member 
Strong back for elevator shafts (Have design need model)
Combine all subteams parts and design the CG to be within +/- one inch from bot centerline
Belay attachment points
skid plate manfacture

TEST on pyramid 

Anti backlash mechanism
Brianna- Design the cross member with leg guide for Red arms and Black arms
Spacers for the side of the hooks, between the arm and the hook?  (Decide if needed during testing)