2013:Electrical Controls 01.24: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
No edit summary
No edit summary
 
Line 11: Line 11:
= Tasks In Progress =
= Tasks In Progress =


*Listing Sensors
*Listing Sensors to be used on climber mechanism.
*Finishing Drawings in Inventor
*Finish sketch/design in inventor.


= Tasks to Complete =
= Tasks to Complete =
Line 19: Line 19:
*Listing any other materials needed
*Listing any other materials needed
*Complete all Inventor Drawings
*Complete all Inventor Drawings
 
*Select an extra set of hinges.
 


= Materials Needed =
= Materials Needed =


*Refer to the BOM
*Refer to the BOM

Latest revision as of 19:00, 24 January 2013

Attendance

Start time: 5:00 pm

End time: 9:00 pm

Members present: Shayna R., Ben S., Nick B., Gafei S., Matt B., Kyle

Members Attending Next Meeting: Shayna R., Ben S., Nick B., Gafei S., Matt B., Kyle

Tasks In Progress

  • Listing Sensors to be used on climber mechanism.
  • Finish sketch/design in inventor.

Tasks to Complete

  • Complete list of sensors
  • Listing any other materials needed
  • Complete all Inventor Drawings
  • Select an extra set of hinges.

Materials Needed

  • Refer to the BOM