2013:Climber 01.26: Difference between revisions
Mechanical1 (talk | contribs) No edit summary |
Mechanical1 (talk | contribs) No edit summary |
||
(8 intermediate revisions by the same user not shown) | |||
Line 27: | Line 27: | ||
Release all fab parts 1/24/13 | Release all fab parts 1/24/13 | ||
list and order all assembly hardware | |||
DONE- check 54 inch cyl | |||
Design | DONE Alex- Design Black arm pivot | ||
DONE Alex- Put in battery | |||
Design release mechanism for red arms and black arms | |||
Design | Design restraining mechanism for red arms and black arms | ||
Add lightening holes all over the place | Brianna- Add sensors to model | ||
Brianna- Design the cross member with leg guide for Red arms and Black arms | |||
DONE Alex -Add lightening holes all over the place | |||
Order all purchase parts | Order all purchase parts | ||
Combine all subteams parts and design the CG to be within +/- one inch from bot centerline | Combine all subteams parts and design the CG to be within +/- one inch from bot centerline | ||
Use cross members to strengthen the elevator shafts | Use cross members to strengthen the elevator shafts | ||
Belay attachment points | Belay attachment points | ||
Revise part #002 with "far side" note | |||
Redesign 002 elevator C chanel to accomodate "new" pyramid. | |||
Now we don't have enough c chanel stock at Chamtek and will have to order 2 and more stock for 2 more for bot 2. | |||
ON HOLD - transmission chain tentioner | ON HOLD - transmission chain tentioner | ||
| | ||
| |
Latest revision as of 13:07, 27 January 2013
Attendance
Start time:
End time:
Members present:
Members Attending Next Meeting:
Tasks Completed
- task
- sub-task
- sub-task
- task
Tasks In Progress
- task
- sub-task
- sub-task
- task
Tasks to Complete
Release all fab parts 1/24/13
list and order all assembly hardware
DONE- check 54 inch cyl
DONE Alex- Design Black arm pivot
DONE Alex- Put in battery
Design release mechanism for red arms and black arms
Design restraining mechanism for red arms and black arms
Brianna- Add sensors to model
Brianna- Design the cross member with leg guide for Red arms and Black arms
DONE Alex -Add lightening holes all over the place
Order all purchase parts
Combine all subteams parts and design the CG to be within +/- one inch from bot centerline
Use cross members to strengthen the elevator shafts
Belay attachment points
Revise part #002 with "far side" note
Redesign 002 elevator C chanel to accomodate "new" pyramid.
Now we don't have enough c chanel stock at Chamtek and will have to order 2 and more stock for 2 more for bot 2.
ON HOLD - transmission chain tentioner
Materials Needed
- task
- sub-task
- sub-task
- task