Release all fab parts 1/24/13
Release all fab parts 1/24/13


Alex-   Design Black arm pivot
list and order all assembly hardware


Alex-   Put in battery
DONE-   check 54 inch cyl


Design release mechanism for long arms and short arms
DONE Alex-   Design Black arm pivot


Design restraining mechanism for long arms and short arms
DONE Alex-   Put in battery
 
Design release mechanism for red arms and black arms
 
Design restraining mechanism for red arms and black arms


Brianna-   Add sensors to model
Brianna-   Add sensors to model
Line 39: Line 43:
Brianna-   Design the cross member with leg guide for Red arms and Black arms
Brianna-   Design the cross member with leg guide for Red arms and Black arms


Add lightening holes all over the place
DONE Alex -Add lightening holes all over the place


Order all purchase parts
Order all purchase parts
Line 48: Line 52:


Belay attachment points
Belay attachment points
Revise part #002 with "far side" note
Redesign 002 elevator C chanel to accomodate "new" pyramid.
          Now we don't have enough c chanel stock at Chamtek and will have to order 2 and more stock for 2 more for bot 2.


ON HOLD - transmission chain tentioner
ON HOLD - transmission chain tentioner

Latest revision as of 13:07, 27 January 2013

Attendance

Start time:

End time:

Members present:

Members Attending Next Meeting:

Tasks Completed

  • task
    • sub-task
    • sub-task
  • task

Tasks In Progress

  • task
    • sub-task
    • sub-task
  • task

Tasks to Complete

Release all fab parts 1/24/13

list and order all assembly hardware

DONE-   check 54 inch cyl

DONE Alex-   Design Black arm pivot

DONE Alex-   Put in battery

Design release mechanism for red arms and black arms

Design restraining mechanism for red arms and black arms

Brianna-   Add sensors to model

Brianna-   Design the cross member with leg guide for Red arms and Black arms

DONE Alex -Add lightening holes all over the place

Order all purchase parts

Combine all subteams parts and design the CG to be within +/- one inch from bot centerline

Use cross members to strengthen the elevator shafts

Belay attachment points

Revise part #002 with "far side" note

Redesign 002 elevator C chanel to accomodate "new" pyramid.

          Now we don't have enough c chanel stock at Chamtek and will have to order 2 and more stock for 2 more for bot 2.

ON HOLD - transmission chain tentioner

 

 

Materials Needed