DONE- check 54 inch cyl | DONE- check 54 inch cyl | ||
Alex- Design Black arm pivot | DONE Alex- Design Black arm pivot | ||
Alex- Put in battery | DONE Alex- Put in battery | ||
Design release mechanism for red arms and black arms | Design release mechanism for red arms and black arms | ||
Line 43: | Line 43: | ||
Brianna- Design the cross member with leg guide for Red arms and Black arms | Brianna- Design the cross member with leg guide for Red arms and Black arms | ||
Add lightening holes all over the place | DONE Alex -Add lightening holes all over the place | ||
Order all purchase parts | Order all purchase parts | ||
Line 54: | Line 54: | ||
Revise part #002 with "far side" note | Revise part #002 with "far side" note | ||
Redesign 002 elevator C chanel to accomodate "new" pyramid. | |||
Now we don't have enough c chanel stock at Chamtek and will have to order 2 and more stock for 2 more for bot 2. | |||
ON HOLD - transmission chain tentioner | ON HOLD - transmission chain tentioner |
Latest revision as of 13:07, 27 January 2013
Attendance
Start time:
End time:
Members present:
Members Attending Next Meeting:
Tasks Completed
- task
- sub-task
- sub-task
- task
Tasks In Progress
- task
- sub-task
- sub-task
- task
Tasks to Complete
Release all fab parts 1/24/13
list and order all assembly hardware
DONE- check 54 inch cyl
DONE Alex- Design Black arm pivot
DONE Alex- Put in battery
Design release mechanism for red arms and black arms
Design restraining mechanism for red arms and black arms
Brianna- Add sensors to model
Brianna- Design the cross member with leg guide for Red arms and Black arms
DONE Alex -Add lightening holes all over the place
Order all purchase parts
Combine all subteams parts and design the CG to be within +/- one inch from bot centerline
Use cross members to strengthen the elevator shafts
Belay attachment points
Revise part #002 with "far side" note
Redesign 002 elevator C chanel to accomodate "new" pyramid.
Now we don't have enough c chanel stock at Chamtek and will have to order 2 and more stock for 2 more for bot 2.
ON HOLD - transmission chain tentioner