2013:Climber 01.26: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
No edit summary
No edit summary
 
(2 intermediate revisions by the same user not shown)
Line 31: Line 31:
DONE-   check 54 inch cyl
DONE-   check 54 inch cyl


Alex-   Design Black arm pivot
DONE Alex-   Design Black arm pivot


Alex-   Put in battery
DONE Alex-   Put in battery


Design release mechanism for red arms and black arms
Design release mechanism for red arms and black arms
Line 43: Line 43:
Brianna-   Design the cross member with leg guide for Red arms and Black arms
Brianna-   Design the cross member with leg guide for Red arms and Black arms


Add lightening holes all over the place
DONE Alex -Add lightening holes all over the place


Order all purchase parts
Order all purchase parts
Line 55: Line 55:
Revise part #002 with "far side" note
Revise part #002 with "far side" note


Redesign 002 elevator C chanel to accomodate "new" pyramid.  
Redesign 002 elevator C chanel to accomodate "new" pyramid.


          Now we don't have enough c chanel stock at Chamtek and will have to order 2 and more stock for 2 more for bot 2.
          Now we don't have enough c chanel stock at Chamtek and will have to order 2 and more stock for 2 more for bot 2.

Latest revision as of 13:07, 27 January 2013

Attendance

Start time:

End time:

Members present:

Members Attending Next Meeting:

Tasks Completed

  • task
    • sub-task
    • sub-task
  • task

Tasks In Progress

  • task
    • sub-task
    • sub-task
  • task

Tasks to Complete

Release all fab parts 1/24/13

list and order all assembly hardware

DONE-   check 54 inch cyl

DONE Alex-   Design Black arm pivot

DONE Alex-   Put in battery

Design release mechanism for red arms and black arms

Design restraining mechanism for red arms and black arms

Brianna-   Add sensors to model

Brianna-   Design the cross member with leg guide for Red arms and Black arms

DONE Alex -Add lightening holes all over the place

Order all purchase parts

Combine all subteams parts and design the CG to be within +/- one inch from bot centerline

Use cross members to strengthen the elevator shafts

Belay attachment points

Revise part #002 with "far side" note

Redesign 002 elevator C chanel to accomodate "new" pyramid.

          Now we don't have enough c chanel stock at Chamtek and will have to order 2 and more stock for 2 more for bot 2.

ON HOLD - transmission chain tentioner

 

 

Materials Needed

  • task
    • sub-task
    • sub-task
  • task