= Tasks to Complete =
= Tasks to Complete =
 
<div>Tom C - TLC for trannys and assembly with motors&nbsp;</div><div>Matt - Bumper design review</div><div>Alex - Climber release mechanism</div><div>Alex - Restraining mechanism for arms</div><div>Dave S. - Sensors for arms and shafts. (Need part numbers so we can start design on 9 sensor mounts)</div><div>Fabricate parts for black arm cross member&nbsp;</div><div>Strong back for elevator shafts (Have design need model)</div><div>Combine all subteams parts and design the CG to be within +/- one inch from bot centerline</div><div>Belay attachment points</div><div>skid plate manfacture</div>
 
'''TEST on pyramid&nbsp;'''
TLC for trannys and assembly with motors&nbsp;
<div>Anti backlash mechanism</div><div>Brianna- Design the cross member with leg guide for Red arms and Black arms</div><div>Spacers for the side of the hooks, between the arm and the hook? &nbsp;(Decide if needed during testing)</div>
 
 
Matt - Bumper design review
 
 
Alex - Climber release mechanism
 
 
Alex - Restraining mechanism for arms
 
 
Dave S. - Sensors for arms and shafts. (Need part numbers so we can start design on 9 sensor mounts)
 
 
Fabricate parts for black arm cross member&nbsp;
 
 
Strong back for elevator shafts (Have design need model)
 
 
Combine all subteams parts and design the CG to be within +/- one inch from bot centerline
 
 
Belay attachment points
 
 
 
 
TEST on pyramid&nbsp;
 
 
 
 
Anti backlash mechanism
 
 
Brianna- Design the cross member with leg guide for Red arms and Black arms
 
 
 
Spacers for the side of the hooks, between the arm and the hook? &nbsp;(Decide if needed during testing)
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 





Latest revision as of 17:12, 5 February 2013

Attendance

Start time:

End time:

Members present:

Members Attending Next Meeting:

Tasks Completed

  • task
    • sub-task
    • sub-task
  • task

Tasks In Progress

  • task
    • sub-task
    • sub-task
  • task

Tasks to Complete

Tom C - TLC for trannys and assembly with motors 
Matt - Bumper design review
Alex - Climber release mechanism
Alex - Restraining mechanism for arms
Dave S. - Sensors for arms and shafts. (Need part numbers so we can start design on 9 sensor mounts)
Fabricate parts for black arm cross member 
Strong back for elevator shafts (Have design need model)
Combine all subteams parts and design the CG to be within +/- one inch from bot centerline
Belay attachment points
skid plate manfacture

TEST on pyramid 

Anti backlash mechanism
Brianna- Design the cross member with leg guide for Red arms and Black arms
Spacers for the side of the hooks, between the arm and the hook?  (Decide if needed during testing)


Materials Needed

  • task
    • sub-task
    • sub-task
  • task