2009:Field/Crate 1.18.09: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
(New page: '''1/18/09''' '''Time Started''': 10:00 am '''Time Ended:''' 4:00 pm '''Tasks Completed:''' 1.) Trailers strengthened 2.) Wood storage organized 3.) Started work on airlock...)
 
 
(One intermediate revision by one other user not shown)
Line 1: Line 1:
'''1/18/09'''
'''1/18/09'''<br>


'''People Present: '''Theo


'''Time Started''': 10:00 am


'''Time Started''': 10:00 am
'''Time Ended:''' 4:00 pm


'''Time Ended:''' 4:00 pm
<br>


'''Tasks Completed:'''<br>


1.) Trailers strengthened<br>


'''Tasks Completed:'''
2.) Wood storage organized<br>


3.) Started work on airlocks


<br>


1.) Trailers strengthened
'''Tasks to Complete:'''<br>


1.) Airlocks<br>


2.) Outposts<br>


2.) Wood storage organized
3.) Alliance Station Walls


<br>


'''Orbit Ball Notes'''<br>


3.) Started work on airlocks
- All Plexi pieces have been cut, sanded, and filed down (Thanks Tom, Cynette, Sharon &amp;&nbsp;Ted)<br>


- Tony&nbsp;D &amp;&nbsp;Tony B created a fixture to create &amp;&nbsp;drill the holes for the orbit ball plexi pieces<br>


- Over half of the pieces have now been drilled with holes


'''Tasks to Complete:'''
'''TO&nbsp;DO:'''


- finish drilling holes


- cut batting for spandex


1.) Airlocks
- cut camo spandex


- create "sample" ball


(Need to get red/white/black spandex in, buy 1/8" rivets)


2.) Outposts
<br>
 
 
 
3.) Alliance Station Walls

Latest revision as of 13:38, 14 November 2010

1/18/09

People Present: Theo

Time Started: 10:00 am

Time Ended: 4:00 pm


Tasks Completed:

1.) Trailers strengthened

2.) Wood storage organized

3.) Started work on airlocks


Tasks to Complete:

1.) Airlocks

2.) Outposts

3.) Alliance Station Walls


Orbit Ball Notes

- All Plexi pieces have been cut, sanded, and filed down (Thanks Tom, Cynette, Sharon & Ted)

- Tony D & Tony B created a fixture to create & drill the holes for the orbit ball plexi pieces

- Over half of the pieces have now been drilled with holes

TO DO:

- finish drilling holes

- cut batting for spandex

- cut camo spandex

- create "sample" ball

(Need to get red/white/black spandex in, buy 1/8" rivets)