2009:Electrical Main 1.27.09: Difference between revisions
From 1511Wookiee
Jump to navigationJump to search
No edit summary |
m (Electrical Main 1.27.09 moved to 2009:Electrical Main 1.27.09) |
||
(2 intermediate revisions by one other user not shown) | |||
Line 15: | Line 15: | ||
*more updates to the BOM<br> | *more updates to the BOM<br> | ||
*Side electrical board is in main robot design in inventor | *Side electrical board is in main robot design in inventor | ||
*cut Lexan for side electrical board | *cut Lexan for side electrical board | ||
*cut Lexan for cRIO mounting plate<br> | |||
<br> | <br> | ||
Line 23: | Line 24: | ||
'''Tasks In Progress:'''<br> | '''Tasks In Progress:'''<br> | ||
*design and fabricate battery box | *design and fabricate battery box<br> | ||
*keep updating BOM | *keep updating BOM | ||
*thinking about the Game | *thinking about the Game | ||
Line 33: | Line 34: | ||
'''Tasks to Complete: '''<br> | '''Tasks to Complete: '''<br> | ||
* | *Find hardware to mount protective cover on electronics (Standoffs, Bolts, Nuts, Spacers)<br> | ||
* | *Find/buy Lexan to make protective cover (goes over side electrical board) | ||
*Mount Mechanism (Jaguar) controllers on side board | |||
*Count up I/O and determine number of side cars necessary | |||
<br> | <br> | ||
---- | ---- |
Latest revision as of 14:38, 14 November 2010
1.27.2009
Start time: 6:30
End time:
Members present: Mike, Crystal, Rika, Collin, Apples, Oranges, Sean
Tasks Completed:
- more updates to the BOM
- Side electrical board is in main robot design in inventor
- cut Lexan for side electrical board
- cut Lexan for cRIO mounting plate
Tasks In Progress:
- design and fabricate battery box
- keep updating BOM
- thinking about the Game
Tasks to Complete:
- Find hardware to mount protective cover on electronics (Standoffs, Bolts, Nuts, Spacers)
- Find/buy Lexan to make protective cover (goes over side electrical board)
- Mount Mechanism (Jaguar) controllers on side board
- Count up I/O and determine number of side cars necessary