2009:Ccontrols20309: Difference between revisions
From 1511Wookiee
Jump to navigationJump to search
(Complete daily notes) |
No edit summary |
||
Line 1: | Line 1: | ||
'''Date: '''2/3/09 | '''Date: '''2/3/09 | ||
'''Start Time:''' 6:30 PM | '''Start Time:''' 6:30 PM | ||
'''End Time:''' 9:30 PM | '''End Time:''' 9:30 PM | ||
'''Members Present:''' Nick, (Eric), (Dean)<br> | '''Members Present:''' Nick, (Eric), (Dean)<br> | ||
'''Tasks Completed:''' | '''Tasks Completed:''' | ||
1. Painted Secondary Control Box<br> | 1. Painted Secondary Control Box<br> | ||
Line 13: | Line 13: | ||
2. Completed drawings for Top Plate L Brackets, Drawer Slide L Brackets and Bottom Box Plate<br> | 2. Completed drawings for Top Plate L Brackets, Drawer Slide L Brackets and Bottom Box Plate<br> | ||
3. Submitted the drawings to Harris' Shop | 3. Submitted the drawings to Harris' Shop | ||
'''Tasks to Complete:''' | '''Tasks to Complete:''' | ||
1. Top Cover | 1. Top Cover needs to be finalized and submitted.<br> | ||
2. Controls need to be added to the true box.<br> | 2. Joy Stick Platform needs to be finalized and submitted | ||
3. Controls need to be added to the true box.<br> |
Revision as of 11:49, 4 February 2009
Date: 2/3/09
Start Time: 6:30 PM
End Time: 9:30 PM
Members Present: Nick, (Eric), (Dean)
Tasks Completed:
1. Painted Secondary Control Box
2. Completed drawings for Top Plate L Brackets, Drawer Slide L Brackets and Bottom Box Plate
3. Submitted the drawings to Harris' Shop
Tasks to Complete:
1. Top Cover needs to be finalized and submitted.
2. Joy Stick Platform needs to be finalized and submitted
3. Controls need to be added to the true box.