2009:Electrical Main 2.7.09: Difference between revisions
From 1511Wookiee
Jump to navigationJump to search
(New page: 2.7.09 Start time: End time: Members present: <u>'''Goals:'''</u> -Get everything mounted onto the lexan - AKA Victors, Distribution block, wireless bridge -Measure out wires and b...) |
No edit summary |
||
Line 1: | Line 1: | ||
2.7.09 | 2.7.09 | ||
Start time: | Start time: 11am | ||
End time: | End time: | ||
Members present: | Members present: Dave, Dave, Rika, Sean, Collin<br> | ||
<br> | |||
'''<u>Tasks Completed:</u>''' | |||
<u> | *Started wiring up the electrical board | ||
*Finished soldering and wiring a mouse!'''<u></u>''' | |||
<u>'''Goals:'''</u> | |||
- | -Get everything mounted onto the lexan - AKA Victors, Distribution block, wireless bridge | ||
-Measure out wires and begin cutting, arranging and assembling if possible - Do we have the wires? | |||
-Work on making that lexan cover, is it done in inventor with the hinges? Do we even HAVE that lexan yet? | |||
== <span style="color: rgb(255, 0, 0);">You guys are amazing keep it up!</span> == | -Update Bill of Materials with purchased wires, all the other stuff Crystal can't think of right now lolz. | ||
<br> | |||
== <span style="color: rgb(255, 0, 0);">You guys are amazing keep it up!</span> == |
Revision as of 12:03, 7 February 2009
2.7.09
Start time: 11am
End time:
Members present: Dave, Dave, Rika, Sean, Collin
Tasks Completed:
- Started wiring up the electrical board
- Finished soldering and wiring a mouse!
Goals:
-Get everything mounted onto the lexan - AKA Victors, Distribution block, wireless bridge
-Measure out wires and begin cutting, arranging and assembling if possible - Do we have the wires?
-Work on making that lexan cover, is it done in inventor with the hinges? Do we even HAVE that lexan yet?
-Update Bill of Materials with purchased wires, all the other stuff Crystal can't think of right now lolz.