2009:Electrical Main 2.9.09: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
No edit summary
No edit summary
Line 3: Line 3:
End time: 9:30pm  
End time: 9:30pm  


Member's present: Crystal, Apples, Oranges, Karen 
Member's present: Crystal, Apples, Oranges, Karen   


<br>
<br>
Line 9: Line 9:
Night's summary:  
Night's summary:  


*We drilled holes into the frame and lexan and now have accessiblilty to mount the electrical board on.&nbsp;&nbsp; Board is bolted on robot.
*Crystal &amp; Dave S.&nbsp;drilled holes into the frame and lexan and now have accessiblilty to mount the electrical board on.&nbsp;&nbsp; Board is bolted on robot.  
*Dave B. &amp; Jeff drilled some more holes for the battery box so it could be slid over to help balance the robot weight.
*Dave B. &amp; Jeff drilled some more holes for the battery box so it could be slid over to help balance the robot weight.  
*we had some of the yummy cake Crystal brought.
*we had some of the yummy cake Crystal brought.

Revision as of 10:51, 10 February 2009

 Start time: 6pm

End time: 9:30pm

Member's present: Crystal, Apples, Oranges, Karen 


Night's summary:

  • Crystal & Dave S. drilled holes into the frame and lexan and now have accessiblilty to mount the electrical board on.   Board is bolted on robot.
  • Dave B. & Jeff drilled some more holes for the battery box so it could be slid over to help balance the robot weight.
  • we had some of the yummy cake Crystal brought.