<p>Finished prototyping on all considered designs. We have decided to disregard the "Bicep Hang" design as it is difficult to implement due to the fact that it causes issues with balancing, and because it would be difficult to stop it from contacting the "Anchor" of the cage. We are moving forward, beginning with CAD designs of the "Double Lever Hang" design because it has the best center of gravity for the hang, and it is relatively simple to implement on the robot, not taking up much space.</p>
<p>Finished prototyping on all considered designs. We have decided to disregard the "Bicep Hang" design as it is difficult to implement due to the fact that it causes issues with balancing, and because it would be difficult to stop it from contacting the "Anchor" of the cage. We are moving forward, beginning with CAD designs of the "Double Lever Hang" design because it has the best center of gravity for the hang, and it is relatively simple to implement on the robot, not taking up much space.</p>
*Selected potential gearbox and motors for hang designs
*Selected potential gearbox and motors for hang designs
Line 27: Line 27:




<span style="text-decoration: underline;" >
<span style="text-decoration: underline;">
<span style="font-size: 18pt;">'''1/18/2025 - CAD:'''</span></span>
<span style="font-size: 18pt;">'''1/18/2025 - CAD:'''</span></span>


Line 34: Line 34:
*<span style="font-size: 12pt;"><span style="font-size: 12pt;">Worked on a CAD model for the double lever hang, including custom made lifter arms.</span></span><span style="font-size: 12pt;"><span style="font-size: 12pt;"></span></span>
*<span style="font-size: 12pt;"><span style="font-size: 12pt;">Worked on a CAD model for the double lever hang, including custom made lifter arms.</span></span><span style="font-size: 12pt;"><span style="font-size: 12pt;"></span></span>
*<span style="font-size: 12pt;"><span style="font-size: 12pt;">[[image:img1737333720411.png|thumb|300px]]</span></span>[[image:img1737297258512.png|thumb|300px]]
*<span style="font-size: 12pt;"><span style="font-size: 12pt;">[[image:img1737333720411.png|thumb|300px]]</span></span>[[image:img1737297258512.png|thumb|300px]]
TO DO:
'''TO DO:'''
*Work with Drive Base and Game piece to finalize drive base dimensions
*Work with Drive Base and Game piece to finalize drive base dimensions
*Continue CAD design
*Continue CAD design
Line 72: Line 72:




<span style="text-decoration: underline;" >'''<span style="font-size: 18pt;">1/19/2025 - CAD:</span>'''</span>
<span style="text-decoration: underline;">'''<span style="font-size: 18pt;">1/19/2025 - CAD:</span>'''</span>


*<span style="font-size: 12pt;">Worked on CAD model for the ratchet and pawl mechanism and attempted to integrate it into the double lever hang design</span>
*<span style="font-size: 12pt;">Worked on CAD model for the ratchet and pawl mechanism and attempted to integrate it into the double lever hang design</span>
Line 78: Line 78:
*<span style="font-size: 12pt;">Mounting pieces for the motor were created and attached</span>
*<span style="font-size: 12pt;">Mounting pieces for the motor were created and attached</span>
*<span style="font-size: 12pt;">Troubles with integrating the ratchet and pawl mechanism became apparent due to lack of space</span>
*<span style="font-size: 12pt;">Troubles with integrating the ratchet and pawl mechanism became apparent due to lack of space</span>
 
'''
<span style="font-size: 14pt;">TO DO:</span>
<span style="font-size: 14pt;" >TO DO:</span>'''
*<span style="font-size: 12pt;">Figure out how to orient the ratchet in order to accomplish a working relationship between both the ratchet and pawl mechanism, and the double lever hang mechanism</span>
*<span style="font-size: 12pt;">Figure out how to orient the ratchet in order to accomplish a working relationship between both the ratchet and pawl mechanism, and the double lever hang mechanism</span>
*<span style="font-size: 12pt;">Continue refining CAD designs for the mechanisms</span>
*<span style="font-size: 12pt;">Continue refining CAD designs for the mechanisms</span>
Line 105: Line 105:
[[image:img1737588881144.png|thumb|300px]]
[[image:img1737588881144.png|thumb|300px]]


<span style="text-decoration: underline;" >'''<span style="font-size: 18pt;">1/21/2025 - CAD:</span>'''</span>
<span style="text-decoration: underline;">'''<span style="font-size: 18pt;">1/21/2025 - CAD:</span>'''</span>
*Discussed with other Subteams about spacing, battery placement, and frame size.
*Discussed with other Subteams about spacing, battery placement, and frame size.
*Moving to alternative designs due to battery placement.
*Moving to alternative designs due to battery placement.
Line 113: Line 113:
***[https://wcproducts.com/products/greyt-telescope GreyT Telescope – WestCoast Products]
***[https://wcproducts.com/products/greyt-telescope GreyT Telescope – WestCoast Products]
***[https://www.andymark.com/products/climber-in-a-box Climber in a Box - AndyMark, Inc]
***[https://www.andymark.com/products/climber-in-a-box Climber in a Box - AndyMark, Inc]
To Do:
'''To Do:'''
*Continue Shallow Cage climb design.
*Continue Shallow Cage climb design.
*Explore potential Deep Cage designs that work with rear battery placement.
*Explore potential Deep Cage designs that work with rear battery placement.
<span style="text-decoration: underline;" >
 
<span style="text-decoration: underline;">
<span style="font-size: 18pt;">'''1/23/2025 - CAD:'''</span></span><br>
<span style="font-size: 18pt;">'''1/23/2025 - CAD:'''</span></span><br>
*<span style="font-size: 12pt;">Worked on creating a sliding hook mechanism to attach onto the (in progress) Shallow Hang Mechanism</span>
*<span style="font-size: 12pt;">Worked on creating a sliding hook mechanism to attach onto the (in progress) Shallow Hang Mechanism</span>
*<span style="font-size: 12pt;">Worked on creating a new ratchet and pawl mechanism for the Shallow Hang Mechanism</span>
*<span style="font-size: 12pt;">Worked on creating a new ratchet and pawl mechanism for the Shallow Hang Mechanism</span>
*<span style="font-size: 12pt;">Worked on creating new motor mounts and orientation of the mechanism in CAD</span>
*<span style="font-size: 12pt;">Worked on creating new motor mounts and orientation of the mechanism in CAD</span>
TO DO:
'''TO DO:'''
*Continue to work on Shallow Cage climb design
*Continue to work on Shallow Cage climb design
*Create an assembly for the Shallow Cage Winch Hang
*Create an assembly for the Shallow Cage Winch Hang
Line 128: Line 129:
*Research and create new deep cage climbing mechanisms that will cooperate with the new found battery placement in the rear end of the robot.
*Research and create new deep cage climbing mechanisms that will cooperate with the new found battery placement in the rear end of the robot.


<br><span style="text-decoration: underline;" >'''<span style="font-size: 18pt;">1/25/2025 - CAD:</span>'''</span>
<br><span style="text-decoration: underline;">'''<span style="font-size: 18pt;">1/25/2025 - CAD:</span>'''</span>
*<span style="font-size: 12pt;">Worked on assembling and configuring the new ratchet and pawl mechanism</span>
*<span style="font-size: 12pt;">Worked on assembling and configuring the new ratchet and pawl mechanism</span>
*<span style="font-size: 12pt;">Worked on creating and assembling the hook for the the shallow hook hang mechanism</span>
*<span style="font-size: 12pt;">Worked on creating and assembling the hook for the the shallow hook hang mechanism</span>
*<span style="font-size: 12pt;">Worked on assembling and integrating the two mechanisms into the final robot</span>
*<span style="font-size: 12pt;">Worked on assembling and integrating the two mechanisms into the final robot</span>
 
'''
<span style="font-size: 12pt;">TO DO:</span>
<span style="font-size: 12pt;" >TO DO:</span>'''
*<span style="font-size: 12pt;">Finalize ratchet and pawl mechanism</span>
*<span style="font-size: 12pt;">Finalize ratchet and pawl mechanism</span>
*<span style="font-size: 12pt;">Finalize the mounting of the mechanisms to the robot</span>
*<span style="font-size: 12pt;">Finalize the mounting of the mechanisms to the robot</span>
Line 203: Line 204:




<span style="text-decoration: underline;" >'''<span style="font-size: 18pt;">12/26/2025 - CAD:</span>'''</span>
<span style="text-decoration: underline;">'''<span style="font-size: 18pt;">12/26/2025 - CAD:</span>'''</span>


*Worked on a re-location of the solenoid on the ratchet mechanism
*Worked on a re-location of the solenoid on the ratchet mechanism
*Insert the assembly in the final robot assembly
*Insert the assembly in the final robot assembly
TO DO:
'''TO DO:'''
*Add fasteners and mounting to the solenoid assembly
*Add fasteners and mounting to the solenoid assembly
*Create and add mounting brackets to connect the winch mount bar to the drive base
*Create and add mounting brackets to connect the winch mount bar to the drive base
*Prepare the design for productions and start shop drawings&nbsp;
*Prepare the design for productions and start shop drawings&nbsp;
<span style="text-decoration: underline;" >'''<span style="font-size: 18pt;">12/28/2025 - CAD and SHOP DRAWINGS:</span>'''</span>
 
<span style="text-decoration: underline;">'''<span style="font-size: 18pt;">12/28/2025 - CAD and SHOP DRAWINGS:</span>'''</span>
*<span style="font-size: 12pt;">Hang ratchet gear was finalized and sent out as a shop drawing</span>
*<span style="font-size: 12pt;">Hang ratchet gear was finalized and sent out as a shop drawing</span>
*<span style="font-size: 12pt;">Worked on finalizing ratchet and pawl mechanism - Almost complete</span>
*<span style="font-size: 12pt;">Worked on finalizing ratchet and pawl mechanism - Almost complete</span>
*<span style="font-size: 12pt;">Worked on making shop drawings for parts</span>
*<span style="font-size: 12pt;">Worked on making shop drawings for parts</span>
 
'''
<span style="font-size: 12pt;">TO DO:</span>
<span style="font-size: 12pt;" >TO DO:</span>'''
*<span style="font-size: 12pt;">Finalize design for production</span>
*<span style="font-size: 12pt;">Finalize design for production</span>
*<span style="font-size: 12pt;">Add brackets and hard wear for mounting&nbsp;</span>
*<span style="font-size: 12pt;">Add brackets and hard wear for mounting&nbsp;</span>
Line 222: Line 224:
<span style="font-size: 12pt;"></span>
<span style="font-size: 12pt;"></span>


<span style="text-decoration: line-through;" >'''<span style="font-size: 18pt;">12/29/2025 - CAD and SHOP <span style="font-size: 12pt;"><span style="font-size: 18pt;">DRAWINGS</span>:</span></span>'''</span>
<span style="text-decoration: line-through;">'''<span style="font-size: 18pt;">12/29/2025 - CAD and SHOP <span style="font-size: 12pt;"><span style="font-size: 18pt;">DRAWINGS</span>:</span></span>'''</span>
*<span style="font-size: 12pt;">Worked on making shop drawings for parts and sending them out</span>
*<span style="font-size: 12pt;">Worked on making shop drawings for parts and sending them out</span>
*<span style="font-size: 12pt;">Finalized the Ratchet and Pawl mechanism&nbsp;</span><span style="font-size: 12pt;"></span>
*<span style="font-size: 12pt;">Finalized the Ratchet and Pawl mechanism&nbsp;</span><span style="font-size: 12pt;"></span>
*<span style="font-size: 12pt;">Made mounting plates for the bar used to mount the ratchet and pawl mechanism</span>
*<span style="font-size: 12pt;">Made mounting plates for the bar used to mount the ratchet and pawl mechanism</span>


<span style="font-size: 12pt;">TO DO:&nbsp;</span>
<span style="font-size: 12pt;">'''TO DO''':&nbsp;</span>
*<span style="font-size: 12pt;">Continue making shop drawings for parts</span>
*<span style="font-size: 12pt;">Continue making shop drawings for parts</span>
*<span style="font-size: 12pt;">Add the mounting brackets and hard wear for mounting</span>
*<span style="font-size: 12pt;">Add the mounting brackets and hard wear for mounting</span>
Line 237: Line 239:
<span style="font-size: 12pt;"></span>
<span style="font-size: 12pt;"></span>


<span style="text-decoration: underline;" >'''<span style="font-size: 18pt;">02/01/2025 - SHOP DRAWINGS and CAD:</span>'''</span>[[image:img1738631448514.png|thumb|300px]]
<span style="text-decoration: underline;">'''<span style="font-size: 18pt;">02/01/2025 - SHOP DRAWINGS and CAD:</span>'''</span>[[image:img1738631448514.png|thumb|300px]]


''''''
''''''
Line 244: Line 246:
*<span style="font-size: 12pt;">Figured out flag sensor for detecting when the solenoid is engaged or not</span>
*<span style="font-size: 12pt;">Figured out flag sensor for detecting when the solenoid is engaged or not</span>
*<span style="font-size: 16px;">Added the mounting brackets and hard wear for mounting</span>
*<span style="font-size: 16px;">Added the mounting brackets and hard wear for mounting</span>
 
'''
<span style="font-size: 12pt;">TO DO:</span>
<span style="font-size: 12pt;" >TO DO:</span>'''
*<span style="font-size: 12pt;">Continue making shop drawings for parts </span>
*<span style="font-size: 12pt;">Continue making shop drawings for parts </span>
*<span style="font-size: 12pt;">Start machining and creating parts for hang</span>
*<span style="font-size: 12pt;">Start machining and creating parts for hang</span>
Line 256: Line 258:
<span style="font-size: 12pt;"></span>
<span style="font-size: 12pt;"></span>


<span style="text-decoration: underline;" >'''<span style="font-size: 18pt;">02/02/2025 - MACHINING and SHOP DRAWINGS:</span>'''</span>
<span style="text-decoration: underline;">'''<span style="font-size: 18pt;">02/02/2025 - MACHINING and SHOP DRAWINGS:</span>'''</span>
*<span style="font-size: 12pt;">Worked on machining and creating the ratchet and pawl mounting bars</span>
*<span style="font-size: 12pt;">Worked on machining and creating the ratchet and pawl mounting bars</span>
*<span style="font-size: 12pt;">Worked on painting the mounting bars[[image:img1738575487921.png|thumb|300px]]</span>
*<span style="font-size: 12pt;">Worked on painting the mounting bars[[image:img1738575487921.png|thumb|300px]]</span>
*<span style="font-size: 12pt;">Worked on starting to assemble the solenoid with the 3D printed mounting brick</span>
*<span style="font-size: 12pt;">Worked on starting to assemble the solenoid with the 3D printed mounting brick</span>
*<span style="font-size: 12pt;">Worked on making more shop drawings</span>
*<span style="font-size: 12pt;">Worked on making more shop drawings</span>
TO DO:
'''TO DO:'''
*Continue assembling the shallow hang mechanism
*Continue assembling the shallow hang mechanism
*Continue manufacturing parts for assembly
*Continue manufacturing parts for assembly
*Start discussing with RCS about controls and programing&nbsp;
*Start discussing with RCS about controls and programing&nbsp;
<span style="text-decoration: underline;" >'''<span style="font-size: 18pt;">02/04/2025 - CAD AND SHOP DRAWINGS:</span>'''</span>
 
<span style="text-decoration: underline;">'''<span style="font-size: 18pt;">02/04/2025 - CAD AND SHOP DRAWINGS:</span>'''</span>
*<span style="font-size: 12pt;">Made shop drawings for parts</span>
*<span style="font-size: 12pt;">Made shop drawings for parts</span>
*<span style="font-size: 12pt;">Finalized the location for the frame mounting bar that hold the ratchet and pawl mechanism in place</span>
*<span style="font-size: 12pt;">Finalized the location for the frame mounting bar that hold the ratchet and pawl mechanism in place</span>
*<span style="font-size: 12pt;">Decided on shallow hang - look into possibly doing deep hang later</span><span style="font-size: 12pt;"></span>
*<span style="font-size: 12pt;">Decided on shallow hang - look into possibly doing deep hang later</span><span style="font-size: 12pt;"></span>
 
'''
<span style="font-size: 12pt;">TO DO:</span>
<span style="font-size: 12pt;" >TO DO:</span>'''
*<span style="font-size: 12pt;">Continue manufacturing and fabricating parts</span>
*<span style="font-size: 12pt;">Continue manufacturing and fabricating parts</span>
*<span style="font-size: 12pt;">Assemble the shallow hook hang mechanism</span>
*<span style="font-size: 12pt;">Assemble the shallow hook hang mechanism</span>
Line 277: Line 280:
*<span style="font-size: 12pt;">Create a pulley to guide the strip to the&nbsp; wheel</span>
*<span style="font-size: 12pt;">Create a pulley to guide the strip to the&nbsp; wheel</span>
*Finalized the hook part for the shallow hang<span style="font-size: 12pt;"></span>
*Finalized the hook part for the shallow hang<span style="font-size: 12pt;"></span>
<span style="text-decoration: underline;" >'''<span style="font-size: 18pt;">02/05/2025 - CAD and MANUFACTURING:</span>'''</span>
 
<span style="text-decoration: underline;">'''<span style="font-size: 18pt;">02/05/2025 - CAD and MANUFACTURING:</span>'''</span>
*<span style="font-size: 12pt;">Worked on the hook for the shallow hang&nbsp;</span>
*<span style="font-size: 12pt;">Worked on the hook for the shallow hang&nbsp;</span>
*<span style="font-size: 12pt;">Worked on manufacturing and making the hex shaft for the ratchet and pawl mechanism on the lathe</span>
*<span style="font-size: 12pt;">Worked on manufacturing and making the hex shaft for the ratchet and pawl mechanism on the lathe</span>
*<span style="font-size: 12pt;">Worked on manufacturing other parts&nbsp;</span>
*<span style="font-size: 12pt;">Worked on manufacturing other parts&nbsp;</span>
 
'''
<span style="font-size: 12pt;">TO DO:</span>
<span style="font-size: 12pt;" >TO DO:</span>'''
*<span style="font-size: 12pt;">Continue manufacturing and fabricating parts</span>
*<span style="font-size: 12pt;">Continue manufacturing and fabricating parts</span>
*<span style="font-size: 12pt;">Continue assembly on ratchet and pawl mechanism&nbsp;</span>
*<span style="font-size: 12pt;">Continue assembly on ratchet and pawl mechanism&nbsp;</span>
Line 302: Line 306:




<span style="text-decoration: underline;" >'''<span style="font-size: 18pt;">02/06/2025 - CAD and MANUFACTURING:</span>'''</span>
<span style="text-decoration: underline;">'''<span style="font-size: 18pt;">02/06/2025 - CAD and MANUFACTURING:</span>'''</span>


*<span style="font-size: 12pt;">Worked on assembling the transmission</span>
*<span style="font-size: 12pt;">Worked on assembling the transmission</span>
Line 321: Line 325:
<span style="font-size: 12pt;"></span>
<span style="font-size: 12pt;"></span>


<span style="text-decoration: underline;" >'''<span style="font-size: 18pt;">02/08/2025 - CAD and MANUFACTURING:</span>'''</span>
<span style="text-decoration: underline;">'''<span style="font-size: 18pt;">02/08/2025 - CAD and MANUFACTURING:</span>'''</span>


<span style="font-size: 12pt;"></span>
<span style="font-size: 12pt;"></span>
Line 330: Line 334:
*<span style="font-size: 12pt;">Worked on shop drawings for parts</span>
*<span style="font-size: 12pt;">Worked on shop drawings for parts</span>
*<span style="font-size: 12pt;">Worked on fixing CAD models - inaccurate dimensioning</span>
*<span style="font-size: 12pt;">Worked on fixing CAD models - inaccurate dimensioning</span>
 
'''
<span style="font-size: 12pt;">TO DO:</span>
<span style="font-size: 12pt;" >TO DO:</span>'''
*<span style="font-size: 12pt;">Continue assembly of mechanisms</span>
*<span style="font-size: 12pt;">Continue assembly of mechanisms</span>
*<span style="font-size: 12pt;">Reprint the solenoid mounting brick - inaccurate printing</span>
*<span style="font-size: 12pt;">Reprint the solenoid mounting brick - inaccurate printing</span>
Line 337: Line 341:
*<span style="font-size: 12pt;">Ensure all CNC parts are completed</span>
*<span style="font-size: 12pt;">Ensure all CNC parts are completed</span>
*<span style="font-size: 12pt;">3D print hook parts and other parts needed[[image:img1739196282451.png|thumb|300px]][[image:img1739174007154.png|thumb|300px]]</span><span style="font-size: 12pt;">[[image:img1739160373724.png|thumb|300px]]</span>
*<span style="font-size: 12pt;">3D print hook parts and other parts needed[[image:img1739196282451.png|thumb|300px]][[image:img1739174007154.png|thumb|300px]]</span><span style="font-size: 12pt;">[[image:img1739160373724.png|thumb|300px]]</span>
<span style="text-decoration: underline;" >'''<span style="font-size: 18pt;" >02/09/2025 - ASSEMBLY and MANUFACTURING:</span>'''</span>
*<span style="font-size: 12pt;" >Worked on starting 3D prints of some parts</span>
*<span style="font-size: 12pt;" >Worked on making more parts on the CNC</span>
*<span style="font-size: 12pt;" >Worked on lock-tighting screws</span>
*<span style="font-size: 12pt;" >Worked on assembling the bars that the hook will mount onto</span><span style="font-size: 12pt;" ><br></span>
'''<span style="font-size: 12pt;" >TO DO:</span>'''
*<span style="font-size: 12pt;" >Finish all 3D printing and CNC parts</span><span style="font-size: 12pt;" ></span>
*<span style="font-size: 12pt;" >Start assembling the hook</span>
*<span style="font-size: 12pt;" >Continue assembly of the shallow hook hang mechanism(s)</span>

Revision as of 13:41, 9 February 2025


1/16/2025 :

Finished prototyping on all considered designs. We have decided to disregard the "Bicep Hang" design as it is difficult to implement due to the fact that it causes issues with balancing, and because it would be difficult to stop it from contacting the "Anchor" of the cage. We are moving forward, beginning with CAD designs of the "Double Lever Hang" design because it has the best center of gravity for the hang, and it is relatively simple to implement on the robot, not taking up much space.

  • Selected potential gearbox and motors for hang designs
Rev MAXPlanetary Gearbox Reduction Chart
Vex VersaPlanetary Gearbox Reduction Chart











1/18/2025 - CAD:

  • Came up with ideas for stop mechanism (Ratchet and Pawl mechanism.)
  • Worked on an idea for outward moving riggers to keep the robot balanced during hang.
  • Worked on a CAD model for the double lever hang, including custom made lifter arms.
  • Img1737333720411.png
    Img1737297258512.png

TO DO:

  • Work with Drive Base and Game piece to finalize drive base dimensions
  • Continue CAD design
  • Work on the Ratchet Mechanism in CAD
  • Figure out where the battery will be placed on the robot
  • CAD design for the funnel/game piece guider
















1/19/2025 - CAD:

  • Worked on CAD model for the ratchet and pawl mechanism and attempted to integrate it into the double lever hang design
  • Lengthened the hex shafts on the CAD model to add another lever on both sides of the lever hang
  • Mounting pieces for the motor were created and attached
  • Troubles with integrating the ratchet and pawl mechanism became apparent due to lack of space

TO DO:

  • Figure out how to orient the ratchet in order to accomplish a working relationship between both the ratchet and pawl mechanism, and the double lever hang mechanism
  • Continue refining CAD designs for the mechanisms
  • Check in with Game piece sub-team
  • Have a conversation with electrical about the placement of the battery
  • Img1737395586375.png
    Img1737430004573.png










Img1737588881144.png

1/21/2025 - CAD:

  • Discussed with other Subteams about spacing, battery placement, and frame size.
  • Moving to alternative designs due to battery placement.
  • Targeting Shallow Cage instead of Deep Cage.
  • Designing single, moving hook mechanism, mounted on elevator crossbar and driven with a winch.
  • Possibly using existing designs:

To Do:

  • Continue Shallow Cage climb design.
  • Explore potential Deep Cage designs that work with rear battery placement.

1/23/2025 - CAD:

  • Worked on creating a sliding hook mechanism to attach onto the (in progress) Shallow Hang Mechanism
  • Worked on creating a new ratchet and pawl mechanism for the Shallow Hang Mechanism
  • Worked on creating new motor mounts and orientation of the mechanism in CAD

TO DO:

  • Continue to work on Shallow Cage climb design
  • Create an assembly for the Shallow Cage Winch Hang
  • Create a prototype off of the assembly
  • Test the prototype
  • Research and create new deep cage climbing mechanisms that will cooperate with the new found battery placement in the rear end of the robot.


1/25/2025 - CAD:

  • Worked on assembling and configuring the new ratchet and pawl mechanism
  • Worked on creating and assembling the hook for the the shallow hook hang mechanism
  • Worked on assembling and integrating the two mechanisms into the final robot

TO DO:

  • Finalize ratchet and pawl mechanism
  • Finalize the mounting of the mechanisms to the robot
  • Update the geometry of the hook to make it more realistic and working
  • Approve parts for drawings and manufacturing

Img1737945519750.png






Img1737894534083.png












Img1737876131398.png














12/26/2025 - CAD:

  • Worked on a re-location of the solenoid on the ratchet mechanism
  • Insert the assembly in the final robot assembly

TO DO:

  • Add fasteners and mounting to the solenoid assembly
  • Create and add mounting brackets to connect the winch mount bar to the drive base
  • Prepare the design for productions and start shop drawings 

12/28/2025 - CAD and SHOP DRAWINGS:

  • Hang ratchet gear was finalized and sent out as a shop drawing
  • Worked on finalizing ratchet and pawl mechanism - Almost complete
  • Worked on making shop drawings for parts

TO DO:

  • Finalize design for production
  • Add brackets and hard wear for mounting 

12/29/2025 - CAD and SHOP DRAWINGS:

  • Worked on making shop drawings for parts and sending them out
  • Finalized the Ratchet and Pawl mechanism 
  • Made mounting plates for the bar used to mount the ratchet and pawl mechanism

TO DO

  • Continue making shop drawings for parts
  • Add the mounting brackets and hard wear for mounting

02/01/2025 - SHOP DRAWINGS and CAD:

Img1738631448514.png

'

  • Worked on shop drawings 
  • Worked on 3D printing the mounting block for the solenoid and 3D printing other hang parts
  • Figured out flag sensor for detecting when the solenoid is engaged or not
  • Added the mounting brackets and hard wear for mounting

TO DO:

  • Continue making shop drawings for parts
  • Start machining and creating parts for hang
  • Start assembling the hang mechanisms

02/02/2025 - MACHINING and SHOP DRAWINGS:

  • Worked on machining and creating the ratchet and pawl mounting bars
  • Worked on painting the mounting bars
    Img1738575487921.png
  • Worked on starting to assemble the solenoid with the 3D printed mounting brick
  • Worked on making more shop drawings

TO DO:

  • Continue assembling the shallow hang mechanism
  • Continue manufacturing parts for assembly
  • Start discussing with RCS about controls and programing 

02/04/2025 - CAD AND SHOP DRAWINGS:

  • Made shop drawings for parts
  • Finalized the location for the frame mounting bar that hold the ratchet and pawl mechanism in place
  • Decided on shallow hang - look into possibly doing deep hang later

TO DO:

  • Continue manufacturing and fabricating parts
  • Assemble the shallow hook hang mechanism
  • Finish all shop drawings
  • Start discussions with RCS about controls and programming of mechanisms
  • Create a pulley to guide the strip to the  wheel
  • Finalized the hook part for the shallow hang

02/05/2025 - CAD and MANUFACTURING:

  • Worked on the hook for the shallow hang 
  • Worked on manufacturing and making the hex shaft for the ratchet and pawl mechanism on the lathe
  • Worked on manufacturing other parts 

TO DO:

  • Continue manufacturing and fabricating parts
  • Continue assembly on ratchet and pawl mechanism 
  • Finalize the hook for the shallow hook hang before starting assembly of it
  • Create a pulley to guide the strip to the wheel
  • Finalize all shop drawings for manufacturing
  • Build a transmission for the winch mechanism
  • Change the colors of the CAD parts to black and red - for matching what are moving and non-moving parts
    Img1738815131418.png







02/06/2025 - CAD and MANUFACTURING:

  • Worked on assembling the transmission
  • Worked on manufacturing parts
  • Worked on painting parts once finished 
  • Worked on CAD - fixing the hook part of the shallow hang mechanism in CAD and worked on finishing the sensor mount for the hook
  • Finalized the hook for the shallow hook hang mechanism

TO DO:

  • Continue manufacturing parts
  • Continue assembly of parts
  • Finalize all shop drawings for manufacturing
  • Create a pulley to guide the strip to the wheel in CAD
  • Change the colors of the CAD parts to black and red - for matching what are moving and non-moving parts

02/08/2025 - CAD and MANUFACTURING:

  • Worked on assembling ratchet and pawl mechanism
  • Worked on manufacturing parts
  • Worked on CNCing parts
  • Worked on sending out parts to be 3D printed
  • Worked on shop drawings for parts
  • Worked on fixing CAD models - inaccurate dimensioning

TO DO:

  • Continue assembly of mechanisms
  • Reprint the solenoid mounting brick - inaccurate printing
  • Add thread locker on the threads of bolts that can get loose
  • Ensure all CNC parts are completed
  • 3D print hook parts and other parts needed
    Img1739196282451.png
    Img1739174007154.png
    Img1739160373724.png




















02/09/2025 - ASSEMBLY and MANUFACTURING:

  • Worked on starting 3D prints of some parts
  • Worked on making more parts on the CNC
  • Worked on lock-tighting screws
  • Worked on assembling the bars that the hook will mount onto

TO DO:

  • Finish all 3D printing and CNC parts
  • Start assembling the hook
  • Continue assembly of the shallow hook hang mechanism(s)