Main Page: Difference between revisions
From 1511Wookiee
Jump to navigationJump to search
Mechanical1 (talk | contribs) No edit summary |
Mechanical1 (talk | contribs) No edit summary |
||
Line 7: | Line 7: | ||
*[[Integration Status|Integration Status]] | *[[Integration Status|Integration Status]] | ||
*[[SignoutList|Parts/Tools Signout List]] | *[[SignoutList|Parts/Tools Signout List]] | ||
*[http://penfieldrobotics.com/wiki/index.php?title=Talk:Mechanical_2.16.2009 <span style="color: #ff0000">Conveyor Redesign Discussion (new 2/19/2009)</span>] - | *[http://penfieldrobotics.com/wiki/index.php?title=Talk:Mechanical_2.16.2009 <span style="color: #ff0000">Conveyor Redesign Discussion (new 2/19/2009)</span>] - 3/1 Status update added short link to TomC POC | ||
*[[RIT Regional Preparation|RIT Regional Preparation]] | *[[RIT Regional Preparation|RIT Regional Preparation]] | ||
*[[Chesapeake Regional Preparation|Chesapeake Regional Preparation]] | *[[Chesapeake Regional Preparation|Chesapeake Regional Preparation]] |
Revision as of 13:13, 1 March 2009
General Pages:
- Robot Design Details
- Controls Details
- Electrical Pin Map
- SHOPPING LIST!!
- Integration Status
- Parts/Tools Signout List
- Conveyor Redesign Discussion (new 2/19/2009) - 3/1 Status update added short link to TomC POC
- RIT Regional Preparation
- Chesapeake Regional Preparation
- Atlanta Championships Preparation
FIRST INFO: Competition Manual Team Updates Team Q&A
Subteam Engineering Notebooks:
At a Minimum EACH Engineering Notebook Entry should include the following:1. Names of team members helping 2. DATE & Start & Stop Time 3. Task List Accomplished 4. Next Tasks to Do 5. Any Images (Inventor, Scanned Sketches, Photos, Etc) Pertinent to the day's work!
|