2010:Mechanical: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
(Mechanical 3.3.2009)
No edit summary
Line 131: Line 131:


[[Mechanical 3.1.2009|Mechanical 3.1.2009]]  
[[Mechanical 3.1.2009|Mechanical 3.1.2009]]  
Mechanical 3.3.2009


To insert a new page using the rich editor, type the text like you see above (ie Mechanical X.XX.2009), highlight it and then select the little link button at the top, then retype your (Mechanical X.XX.2009) page.<br>
To insert a new page using the rich editor, type the text like you see above (ie Mechanical X.XX.2009), highlight it and then select the little link button at the top, then retype your (Mechanical X.XX.2009) page.<br>

Revision as of 10:34, 3 March 2009

Master Task List

  1. Design Motor Mounts...Done
  2. Design Bearing Mounts ...Done
  3. Help Drivetrain with ProE Import
  4. Have other teams review Trap Doors - Integration
  5. Keep Track of Weight Distribution - Integration- Around 85 lbs minus cRIO, belting, bumpers and battery
  6. Complete Bill of Materials
  7. Assign Surfaces for Control System Mounting
  8. Determine if front wheels are needed
  9. Choose & Order Materials/Parts
  10. Create Model Shop Drawings...Week 3 main focus
  11. Add all belts & pulleys to design
  12. Define Roller/Chicken Plucker designs ...Done
  13. Complete Trap Door designs in Inventor ...Done
  14. Define outside material for robot
  15. Design Sensor Mounts
  16. Design Battery Box & CRio Mount (Electrical needs help)...Finished by Rika
  17. Mock up Weight on the Chassis so programming/Drivers can use  ...Done
  18. Design seperator


To do lists made on 2/16/09:  Before ship, After Ship and at RIT are found in the log entry for 2/16/09


Resources

The 2009 Kit of Parts are designed in Autodesk Inventor Professional and available through the Autodesk FIRSTbase website.


This is the Mechanical Subteam 1's Engineering Notebook

Week 1 - 42 Days Left!!

Mechanical 1 - 1.6.09

Mechanical 1 - 1.7.09

Mechanical 1 - 1.8.09

Mechanical 1 - 1.10.09

Mechanical 1 - 1.11.09

Week 2 -35 Days Left!!

Mechanical 1 - 1.13.09

Mechanical 1 - 1.14.09

Mechanical 1 - 1.15.09

Mechanical 1 - 1.17.09

Mechanical 1 - 1.18.09

Week 3 - 28 Days Left!!

Mechanical 1 - 1.20.09

Mechanical 1 - 1.21.09

Mechanical 1 - 1.22.09

Mechanical 1 - 1.24.09

Mechanical 1 - 1.25.09

Week 4 - 21 Days Left!!

Mechanical 1.27.2009

Mechanical 1.28.2009

Mechanical 1.29.2009

Mechanical 1.31.2009

Mechanical 2.1.2009

Week 5 - 14 Days Left!!

Mechanical 2.2.2009

Mechanical 2.3.2009

Mechanical 2.4.2009

Mechanical 2.5.2009

Mechanical 2.7.2009

Mechanical 2.8.2009

Week 6 - 7 Days Left!!

Mechanical 2.9.2009

Mechanical 2.10.2009

Mechanical 2.11.2009

Mechanical 2.12.2009

Mechanical 2.13.2009

Mechanical 2.14.2009

Mechanical 2.15.2009

Mechanical 2.16.2009 - Conveyor Redesign Discussion

Mechanical 2.17.2009

After Ship

Mechanical 2.18.2009

Mechanical 2.19.2009

Mechanical 2.20.2009

Mechanical 2.21.2009

Mechanical 2.22.2009

Mechanical 2.23.2009

Mechanical 2.28.2009

Mechanical 3.1.2009

Mechanical 3.3.2009

To insert a new page using the rich editor, type the text like you see above (ie Mechanical X.XX.2009), highlight it and then select the little link button at the top, then retype your (Mechanical X.XX.2009) page.



Please Label All Notebook Pages Mechanical 1 X.XX.2009 to avoid confusion.