2009:Electrical Meeting 10.22: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
No edit summary
No edit summary
Line 8: Line 8:
*fix the moue wire labels.<br>
*fix the moue wire labels.<br>


 
<br>


Mouse wire layout:  
Mouse wire layout:  
Line 26: Line 26:
*Finished the mouse wire layout.<br>
*Finished the mouse wire layout.<br>


<br>


 
<br>
 


Next week's meeting:  
Next week's meeting:  


*Rofl(Waffle)-Bot needs to be fixed
*Rofl(Waffle)-Bot needs to be fixed  
*design a cover for the back of the control box
*PUT MOUSE BALL BACK IN!!!

Revision as of 15:57, 22 October 2009

Attendance: Mike H, Tom P, Vaughn, Crystal V, Matthieu D, Andy M, Dave and Dave, Jeff.


Goals of the night:

  • Finish the Mouse repairs
  • fix the moue wire labels.


Mouse wire layout:

XA=AD2

XB=BD2

YA=AD1

YB=BD1


Progress and Completion:

  • Finished the mouse wire layout.



Next week's meeting:

  • Rofl(Waffle)-Bot needs to be fixed
  • design a cover for the back of the control box
  • PUT MOUSE BALL BACK IN!!!