2009:Electrical Meeting 10.22: Difference between revisions
From 1511Wookiee
Jump to navigationJump to search
No edit summary |
No edit summary |
||
Line 24: | Line 24: | ||
Progress and Completion: | Progress and Completion: | ||
*Finished the mouse wire layout.<br> | *Finished the mouse wire layout. | ||
*Filed the mouse, still needs a little bit of work.<br> | |||
<br> | <br> | ||
Line 34: | Line 35: | ||
*Rofl(Waffle)-Bot needs to be fixed | *Rofl(Waffle)-Bot needs to be fixed | ||
*design a cover for the back of the control box | *design a cover for the back of the control box | ||
*PUT MOUSE BALL BACK IN!!! | *PUT MOUSE BALL BACK IN!!! | ||
*Mechanical gets to fix the mouse. |
Revision as of 16:23, 22 October 2009
Attendance: Mike H, Tom P, Vaughn, Crystal V, Matthieu D, Andy M, Dave and Dave, Jeff.
Goals of the night:
- Finish the Mouse repairs
- fix the moue wire labels.
Mouse wire layout:
XA=AD2
XB=BD2
YA=AD1
YB=BD1
Progress and Completion:
- Finished the mouse wire layout.
- Filed the mouse, still needs a little bit of work.
Next week's meeting:
- Rofl(Waffle)-Bot needs to be fixed
- design a cover for the back of the control box
- PUT MOUSE BALL BACK IN!!!
- Mechanical gets to fix the mouse.