2009:Electrical Meeting 10.22: Difference between revisions
From 1511Wookiee
Jump to navigationJump to search
No edit summary |
m (Electrical Meeting 10.22 moved to 2009:Electrical Meeting 10.22) |
(No difference)
|
Latest revision as of 13:38, 14 November 2010
Attendance: Mike H, Tom P, Vaughn, Crystal V, Matthieu D, Andy M, Dave and Dave, Jeff.
Goals of the night:
- Finish the Mouse repairs
- fix the moue wire labels.
Mouse wire layout:
XA=AD2
XB=BD2
YA=AD1
YB=BD1
Progress and Completion:
- Finished the mouse wire layout.
- Filed the mouse, still needs a little bit of work.
Next week's meeting:
- Rofl(Waffle)-Bot needs to be fixed
- design a cover for the back of the control box
- PUT MOUSE BALL BACK IN!!!
- Mechanical gets to fix the mouse.