2010:Drivetrain 01.13: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
(New page: At a Minimum EACH Engineering Notebook Entry should include the following: 1. Names of the people that attended  Tresten.R  Lizzy.M  Matt.M Ben.S Graeme.B  Josh.Gannon...)
 
No edit summary
Line 1: Line 1:
At a Minimum EACH Engineering Notebook Entry should include the following:
At a Minimum EACH Engineering Notebook Entry should include the following:  


1. Names of the people that attended&nbsp; Tresten.R&nbsp; Lizzy.M&nbsp; Matt.M Ben.S Graeme.B&nbsp; Josh.Gannon<br>
1. Names of the people that attended&nbsp; Tresten.R&nbsp; Lizzy.M&nbsp; Matt.M Ben.S Graeme.B&nbsp; Josh.Gannon<br>  


2. DATE &amp; Start &amp; Stop Time 6:40<br>
2. DATE &amp; Start &amp; Stop Time 6:40<br>  


3. Tasks accomplished
3. Tasks accomplished  


4. Tasks in process
*Updated BOM
*Parts ordered:


5. Tasks to complete tomorrow
#Motor mounts
#Chassis brackets
#Bearing blocks
#Cross brace


6. Names of people attending tomorrow Tresten.R Lizzy.M Matt.M Gaeme.B Ben.S<br>


7. Materials are needed to work


8. Any Images (Inventor, Scanned Sketches, Photos, Etc) Pertinent to the day's work!<br>In addition, you can do any details or lessons learned from your tasks done that day. Feel free to attach any photos, details, spreadsheets, CAD screenshots or drawings.
4. Tasks in process
 
5. Tasks to complete tomorrow
 
6. Names of people attending tomorrow Tresten.R Lizzy.M Matt.M Gaeme.B Ben.S<br>
 
7. Materials are needed to work
 
8. Any Images (Inventor, Scanned Sketches, Photos, Etc) Pertinent to the day's work!<br>In addition, you can do any details or lessons learned from your tasks done that day. Feel free to attach any photos, details, spreadsheets, CAD screenshots or drawings.  


<br><br>
<br><br>

Revision as of 16:16, 13 January 2010

At a Minimum EACH Engineering Notebook Entry should include the following:

1. Names of the people that attended  Tresten.R  Lizzy.M  Matt.M Ben.S Graeme.B  Josh.Gannon

2. DATE & Start & Stop Time 6:40

3. Tasks accomplished

  • Updated BOM
  • Parts ordered:
  1. Motor mounts
  2. Chassis brackets
  3. Bearing blocks
  4. Cross brace


4. Tasks in process

5. Tasks to complete tomorrow

6. Names of people attending tomorrow Tresten.R Lizzy.M Matt.M Gaeme.B Ben.S

7. Materials are needed to work

8. Any Images (Inventor, Scanned Sketches, Photos, Etc) Pertinent to the day's work!
In addition, you can do any details or lessons learned from your tasks done that day. Feel free to attach any photos, details, spreadsheets, CAD screenshots or drawings.