2010:Controls 01.26: Difference between revisions
From 1511Wookiee
Jump to navigationJump to search
(New page: = Attendance: = Crystal, Averill, Karen = Tasks: = *Take measurements of the new official box to create a model of the sheet metal mount so that it can be fabricated ASAP. *Switch the...) |
No edit summary |
||
Line 5: | Line 5: | ||
= Tasks: = | = Tasks: = | ||
*Take measurements of the new official box to create a model of the sheet metal mount so that it can be fabricated ASAP. | *Take measurements of the new official box to create a model of the sheet metal mount so that it can be fabricated ASAP. | ||
*Switch the joystick screws to plack screws | *Switch the joystick screws to plack screws |
Revision as of 17:10, 26 January 2010
Attendance:
Crystal, Averill, Karen
Tasks:
- Take measurements of the new official box to create a model of the sheet metal mount so that it can be fabricated ASAP.
- Switch the joystick screws to plack screws