2009:Mechanical 2 - 1.8.09: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
(New page: Tasks completed: <br>- Worked with Drive Train to conclude to determine the spacing for collection. <br>- the spacing analysis is completed to the extent of what he have plane...)
 
m (Formatting)
Line 1: Line 1:
Tasks completed: <br>- Worked with Drive Train to conclude to determine the spacing for collection.
'''1.08.2009'''


<br>-&nbsp;the spacing&nbsp;analysis is completed to the extent of what he have planed in the design as of now.
'''Start Time:'''


<br>Tasks to complete:
'''End Time:'''


<br>-Finish available space analysis after determining the sizes of the additional, drop door, paddle wheel, and mechanism that stops the balls from being sucked up while scoring. This should be done by Saturday morning.
'''Members Present:'''
 
'''Tasks completed: '''<br>- Worked with Drive Train to conclude to determine the spacing for collection.<br>-&nbsp;the spacing&nbsp;analysis is completed to the extent of what he have planed in the design as of now.
 
<br>'''Tasks to complete: '''<br>-Finish available space analysis after determining the sizes of the additional, drop door, paddle wheel, and mechanism that stops the balls from being sucked up while scoring. This should be done by Saturday morning.  
 
----
 
[[Mechanical 2|Mechanical 2 Main Page]]

Revision as of 10:51, 11 January 2009

1.08.2009

Start Time:

End Time:

Members Present:

Tasks completed: 
- Worked with Drive Train to conclude to determine the spacing for collection.
- the spacing analysis is completed to the extent of what he have planed in the design as of now.


Tasks to complete:
-Finish available space analysis after determining the sizes of the additional, drop door, paddle wheel, and mechanism that stops the balls from being sucked up while scoring. This should be done by Saturday morning.


Mechanical 2 Main Page