2010:Drivetrain 02.07: Difference between revisions
From 1511Wookiee
Jump to navigationJump to search
Drivetrain (talk | contribs) No edit summary |
Drivetrain (talk | contribs) No edit summary |
||
Line 1: | Line 1: | ||
02.07.2010 | 02.07.2010 | ||
Start time: | Start time:10:30 | ||
End time: | End time: | ||
Members present: | Members present: Lizzy Matt M Ben S Alex R | ||
Members Attending Next Meeting: | Members Attending Next Meeting: | ||
Line 11: | Line 11: | ||
Tasks Completed: | Tasks Completed: | ||
* | *Adjusted motor mounts - squared up frame, added spacers | ||
*Painted ball guard tube and wheel guard | |||
<br>Tasks In Progress: | <br>Tasks In Progress: | ||
* | *Prep-work for assembly - waiting for wheel guards to dry | ||
<br>Tasks to Complete: | <br>Tasks to Complete: | ||
* | *Assemble chassis with wheel guard<br> | ||
<br>Materials Needed: | <br>Materials Needed: |
Revision as of 12:55, 7 February 2010
02.07.2010
Start time:10:30
End time:
Members present: Lizzy Matt M Ben S Alex R
Members Attending Next Meeting:
Tasks Completed:
- Adjusted motor mounts - squared up frame, added spacers
- Painted ball guard tube and wheel guard
Tasks In Progress:
- Prep-work for assembly - waiting for wheel guards to dry
Tasks to Complete:
- Assemble chassis with wheel guard
Materials Needed:
- item
* item
Do not forget to add your needed items to the Shopping List!!
Images & Additional Updates:
(Make sure you are in the Rich Editor and use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. Sizing can be done using the length/width pixel size)
Test Engineering Notebook Template