2010:Electrical Main 02.13: Difference between revisions

From 1511Wookiee
Jump to navigationJump to search
No edit summary
No edit summary
Line 1: Line 1:
-cRIO is magic and decided to drop from 4.12lbs to 2.74lbs  
-cRIO is magic and decided to drop from 4.12lbs to 2.74lbs  


-Lexan arrived - cut to size for electrical board
-Lexan arrived - cut to size for electrical board  


-mounted components on electrical board.
-mounted components on electrical board.
1.28.2010
'''Start time: '''6:00<br>
'''End time: '''9:00<br>
'''Members present: '''Michael Hartman, Dave B., Tom Powers, Kevin Krech, Matthieu Dora<br>
----
'''Tasks to Complete: '''<br>
*Shopping List<br>
*BOM updated<br>
<br>
----
'''Materials Needed: '''<br>
*Jaguar speed controllor (4 to order)<br>
*PWM Heads and pins (60 ea)
Do not forget to add your needed items to the [[ShoppingList|Shopping List]]!!
----
'''Images &amp; Additional Updates:'''
(Use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above. &nbsp;Sizing can be done using the length/width pixel size) <br>
<br>

Revision as of 07:45, 14 February 2010

-cRIO is magic and decided to drop from 4.12lbs to 2.74lbs

-Lexan arrived - cut to size for electrical board

-mounted components on electrical board. 1.28.2010

Start time: 6:00

End time: 9:00

Members present: Michael Hartman, Dave B., Tom Powers, Kevin Krech, Matthieu Dora


Tasks to Complete:

  • Shopping List
  • BOM updated



Materials Needed:

  • Jaguar speed controllor (4 to order)
  • PWM Heads and pins (60 ea)

Do not forget to add your needed items to the Shopping List!!


Images & Additional Updates:

(Use the upload file button on the toolbox to the left to upload the file, then insert an image using the button above.  Sizing can be done using the length/width pixel size)